Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle

Based on the theoretical and test data calculation, and combining the first and second phase vehicle of Ningbo line 1 operation energy consumption statistical data, the importance of reasonable choice of ground energy recovering equipment capacity to the metro operation and vehicle was evaluated, wh...

Full description

Saved in:
Bibliographic Details
Main Authors: LI Yiguo, ZHAO Qin, WANG Junping, LI Jie
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2017-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2017.03.018
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850142597137301504
author LI Yiguo
ZHAO Qin
WANG Junping
LI Jie
author_facet LI Yiguo
ZHAO Qin
WANG Junping
LI Jie
author_sort LI Yiguo
collection DOAJ
description Based on the theoretical and test data calculation, and combining the first and second phase vehicle of Ningbo line 1 operation energy consumption statistical data, the importance of reasonable choice of ground energy recovering equipment capacity to the metro operation and vehicle was evaluated, while the choice of ground regenerative energy absorption equipment capacity was verified, which provided the basis of data fine tuning.
format Article
id doaj-art-5fdaf3535c06427baf9a072e486e063e
institution OA Journals
issn 1000-128X
language zho
publishDate 2017-01-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-5fdaf3535c06427baf9a072e486e063e2025-08-20T02:29:00ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2017-01-01818620916389Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro VehicleLI YiguoZHAO QinWANG JunpingLI JieBased on the theoretical and test data calculation, and combining the first and second phase vehicle of Ningbo line 1 operation energy consumption statistical data, the importance of reasonable choice of ground energy recovering equipment capacity to the metro operation and vehicle was evaluated, while the choice of ground regenerative energy absorption equipment capacity was verified, which provided the basis of data fine tuning.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2017.03.018regenerative energy absorption equipmentground energy recovering equipmentoperation energy consumptioncapacity choicemetro vehicle
spellingShingle LI Yiguo
ZHAO Qin
WANG Junping
LI Jie
Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle
机车电传动
regenerative energy absorption equipment
ground energy recovering equipment
operation energy consumption
capacity choice
metro vehicle
title Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle
title_full Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle
title_fullStr Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle
title_full_unstemmed Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle
title_short Capacity Choice of Ground Regenerative Braking Energy Absorption Equipment for Metro Vehicle
title_sort capacity choice of ground regenerative braking energy absorption equipment for metro vehicle
topic regenerative energy absorption equipment
ground energy recovering equipment
operation energy consumption
capacity choice
metro vehicle
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2017.03.018
work_keys_str_mv AT liyiguo capacitychoiceofgroundregenerativebrakingenergyabsorptionequipmentformetrovehicle
AT zhaoqin capacitychoiceofgroundregenerativebrakingenergyabsorptionequipmentformetrovehicle
AT wangjunping capacitychoiceofgroundregenerativebrakingenergyabsorptionequipmentformetrovehicle
AT lijie capacitychoiceofgroundregenerativebrakingenergyabsorptionequipmentformetrovehicle