Research on Fluid Transient and Operation Scheduling Safety of Water Supply System
In order to prevent the water hammer caused by the change of water demand and accidental pump stop in the actual operation of the water supply system,based on the actual water supply project and method of characteristics,this paper establishes the hydraulic transition process model of the pump water...
Saved in:
Main Authors: | YUAN Zhe, ZHOU Zixuan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2021-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.10.014 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Dynamic characterization of water hammer in gangue fly ash slurry pipelines during valve closure
by: Yuxin Hao, et al.
Published: (2024-05-01) -
Water Supply Scheduling for Cross-basin Reservoir Groups Based on Improved Scheduling Diagram
by: ZHAO Siqi, et al.
Published: (2023-01-01) -
Numerical Methods of Visco-elastic Segments on Water Hammer Pressures
by: J. Rahimi Firuz, et al.
Published: (2020-06-01) -
Unveiling the impact of pipe materials on water hammer in pressure pipelines: an experimental and numerical study
by: M. Kandil, et al.
Published: (2024-12-01) -
DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
by: V. V. Ivashechkin
Published: (2016-03-01)