Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran
The purpose of the current work was to develop strategies suitable for the construction waste management for construction waste processing, recycling or landfilling plants in Tehran metropolis, Iran. This integrated methods study was of an applied type with an exploratory approach, which used a FAN...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
OICC Press
2024-12-01
|
Series: | Anthropogenic Pollution |
Subjects: | |
Online Access: | http://oiccpress.com/ap/article/view/8551 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1823865081485590528 |
---|---|
author | Hossein Aligholizadeh Saeed Motahari Maryam Farahani Hasan Samadyar |
author_facet | Hossein Aligholizadeh Saeed Motahari Maryam Farahani Hasan Samadyar |
author_sort | Hossein Aligholizadeh |
collection | DOAJ |
description |
The purpose of the current work was to develop strategies suitable for the construction waste management for construction waste processing, recycling or landfilling plants in Tehran metropolis, Iran. This integrated methods study was of an applied type with an exploratory approach, which used a FANP-DEMATEL combined model as one of the most appropriate strategic planning methodologies. Thus, the environment of Tehran waste management organization (TWMO) was evaluated by preparing a SWOT matrix consisting of 10 strengths (S), 12 weaknesses (W), 9 opportunities (O), and 7 threats (T). According to the results, the TWMO was positioned in the WT box (IFE: 2.45 and EFE: 2.33), indicating the necessity of adopting a defensive strategy as the best priority. On the other hand, the FANP-DEMATEL technique also confirmed the accuracy of WT strategies with a score of 12.627. Results shown that the best determined WT strategy was “Preventing mixing or separating waste at the source for easier recycling at the plant site" (Weighting factor: 0.9). These findings showed the importance of the proposed strategy for the growth and success of construction and demolition waste management in Tehran.
|
format | Article |
id | doaj-art-5eef59b31e784765acb77045f5c4035e |
institution | Kabale University |
issn | 2783-1736 2588-4646 |
language | English |
publishDate | 2024-12-01 |
publisher | OICC Press |
record_format | Article |
series | Anthropogenic Pollution |
spelling | doaj-art-5eef59b31e784765acb77045f5c4035e2025-02-08T11:19:28ZengOICC PressAnthropogenic Pollution2783-17362588-46462024-12-018210.57647/j.jap.2024.0802.18Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, IranHossein Aligholizadeh0https://orcid.org/0009-0007-5745-1426Saeed Motahari1https://orcid.org/0000-0003-3926-8971Maryam Farahani2https://orcid.org/0000-0003-2171-7732Hasan Samadyar3https://orcid.org/0000-0002-5955-3772Department of Environment, Roudehen Branch, Islamic Azad University, Roudehen, IranDepartment of Environment, Roudehen Branch, Islamic Azad University, Roudehen, IranDepartment of Environment, Roudehen Branch, Islamic Azad University, Roudehen, IranDepartment of Environment, Roudehen Branch, Islamic Azad University, Roudehen, Iran The purpose of the current work was to develop strategies suitable for the construction waste management for construction waste processing, recycling or landfilling plants in Tehran metropolis, Iran. This integrated methods study was of an applied type with an exploratory approach, which used a FANP-DEMATEL combined model as one of the most appropriate strategic planning methodologies. Thus, the environment of Tehran waste management organization (TWMO) was evaluated by preparing a SWOT matrix consisting of 10 strengths (S), 12 weaknesses (W), 9 opportunities (O), and 7 threats (T). According to the results, the TWMO was positioned in the WT box (IFE: 2.45 and EFE: 2.33), indicating the necessity of adopting a defensive strategy as the best priority. On the other hand, the FANP-DEMATEL technique also confirmed the accuracy of WT strategies with a score of 12.627. Results shown that the best determined WT strategy was “Preventing mixing or separating waste at the source for easier recycling at the plant site" (Weighting factor: 0.9). These findings showed the importance of the proposed strategy for the growth and success of construction and demolition waste management in Tehran. http://oiccpress.com/ap/article/view/8551Construction waste managemeFANP-DEMATESWOTTehran |
spellingShingle | Hossein Aligholizadeh Saeed Motahari Maryam Farahani Hasan Samadyar Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran Anthropogenic Pollution Construction waste manageme FANP-DEMATE SWOT Tehran |
title | Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran |
title_full | Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran |
title_fullStr | Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran |
title_full_unstemmed | Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran |
title_short | Identification and prioritization of construction waste management strategies using an integrated FANP-DEMATEL/SWOT model in Tehran metropolis, Iran |
title_sort | identification and prioritization of construction waste management strategies using an integrated fanp dematel swot model in tehran metropolis iran |
topic | Construction waste manageme FANP-DEMATE SWOT Tehran |
url | http://oiccpress.com/ap/article/view/8551 |
work_keys_str_mv | AT hosseinaligholizadeh identificationandprioritizationofconstructionwastemanagementstrategiesusinganintegratedfanpdematelswotmodelintehranmetropolisiran AT saeedmotahari identificationandprioritizationofconstructionwastemanagementstrategiesusinganintegratedfanpdematelswotmodelintehranmetropolisiran AT maryamfarahani identificationandprioritizationofconstructionwastemanagementstrategiesusinganintegratedfanpdematelswotmodelintehranmetropolisiran AT hasansamadyar identificationandprioritizationofconstructionwastemanagementstrategiesusinganintegratedfanpdematelswotmodelintehranmetropolisiran |