Hydrodemolition and drill and blast: A new way to improve tunnel contour quality
Abstract Drill and Blast is one of the most utilized excavation methods due to its cost and adaptation capability. One undesirable feature, however, is the contour shape quality of the blasted cavity. It is usually larger and rougher than planned. This characteristic is related to the crack generate...
Saved in:
| Main Authors: | Rafael Pacheco dos Santos, Marcos Aurélio Marques Noronha, Patrícia de Oliveira Faria, Thiane Pereira Poncetta Coliboro |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Fundação Gorceix
2025-01-01
|
| Series: | REM: International Engineering Journal |
| Subjects: | |
| Online Access: | http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2025000100204&lng=en&tlng=en |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Mitigation strategies for blasting-induced cracks and vibrations in twin-arch tunnel structures
by: Xianshun Zhou, et al.
Published: (2025-07-01) -
Advancing overbreak prediction in drilling and blasting tunnel using MVO, SSA and HHO-based SVM models with interpretability analysis
by: Yulin Zhang, et al.
Published: (2025-05-01) -
Study on the evolution of rock damage and blasting characteristics of deep tunnel splitting and drilling with explosives
by: Shigui FU, et al.
Published: (2025-06-01) -
Study on Vibration Effects and Optimal Delay Time for Tunnel Cut-Blasting Beneath Existing Railways
by: Ruifeng Huang, et al.
Published: (2025-07-01) -
Risk Assessment of Drilling and Blasting Method Based on Nonlinear FAHP and Combination Weighting
by: Cheng Ji, et al.
Published: (2025-04-01)