LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)

Leakage occurred on a company′s waste heat recovery unit after short-term operation of it. In order to determine the cause of the leak and take effective countermeasures, the reasons for the failure of the waste heat recovery device were analyzed. Firstly, the stress level of the waste heat recovery...

Full description

Saved in:
Bibliographic Details
Main Authors: REN ZiQi, DONG JinShan, FENG Jun, DING Yi
Format: Article
Language:zho
Published: Editorial Office of Journal of Mechanical Strength 2023-01-01
Series:Jixie qiangdu
Subjects:
Online Access:http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2023.02.028
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841534407971700736
author REN ZiQi
DONG JinShan
FENG Jun
DING Yi
author_facet REN ZiQi
DONG JinShan
FENG Jun
DING Yi
author_sort REN ZiQi
collection DOAJ
description Leakage occurred on a company′s waste heat recovery unit after short-term operation of it. In order to determine the cause of the leak and take effective countermeasures, the reasons for the failure of the waste heat recovery device were analyzed. Firstly, the stress level of the waste heat recovery device under working condition was calculated by Ansys simulation software, and the maximum stress point was found at the tube sheet, and the stress value at the joint of tube sheet and heat exchange tube was larger.Then, macro-corrosion morphology analysis, metallographic microstructure analysis, micro-hardness test, scanning electron microscope(SEM) analysis of corrosion micro-morphology and EDS micro-area composition analysis of corrosion products were carried out on the sampling site of tube bundle leakage.The results show that, because of high temperature, increasing alkali concentration occurs at the crack of tube bundle. And welding cracks exist there, which eventually leads to alkali stress corrosion cracking at the weld of tube sheet and tube bundle.
format Article
id doaj-art-5c362288aebe4750bc77ce8d1361f685
institution Kabale University
issn 1001-9669
language zho
publishDate 2023-01-01
publisher Editorial Office of Journal of Mechanical Strength
record_format Article
series Jixie qiangdu
spelling doaj-art-5c362288aebe4750bc77ce8d1361f6852025-01-15T02:40:15ZzhoEditorial Office of Journal of Mechanical StrengthJixie qiangdu1001-96692023-01-0146246836351344LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)REN ZiQiDONG JinShanFENG JunDING YiLeakage occurred on a company′s waste heat recovery unit after short-term operation of it. In order to determine the cause of the leak and take effective countermeasures, the reasons for the failure of the waste heat recovery device were analyzed. Firstly, the stress level of the waste heat recovery device under working condition was calculated by Ansys simulation software, and the maximum stress point was found at the tube sheet, and the stress value at the joint of tube sheet and heat exchange tube was larger.Then, macro-corrosion morphology analysis, metallographic microstructure analysis, micro-hardness test, scanning electron microscope(SEM) analysis of corrosion micro-morphology and EDS micro-area composition analysis of corrosion products were carried out on the sampling site of tube bundle leakage.The results show that, because of high temperature, increasing alkali concentration occurs at the crack of tube bundle. And welding cracks exist there, which eventually leads to alkali stress corrosion cracking at the weld of tube sheet and tube bundle.http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2023.02.028Waste heat recovery deviceLeakageFinite element simulationStress analysisFailure analysisAlkali stress corrosion
spellingShingle REN ZiQi
DONG JinShan
FENG Jun
DING Yi
LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)
Jixie qiangdu
Waste heat recovery device
Leakage
Finite element simulation
Stress analysis
Failure analysis
Alkali stress corrosion
title LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)
title_full LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)
title_fullStr LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)
title_full_unstemmed LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)
title_short LEAKAGE FAILURE ANALYSIS OF TUBE BUNDLE CONNECTION OF FLUE GAS WASTE HEAT RECOVERY DEVICE (MT)
title_sort leakage failure analysis of tube bundle connection of flue gas waste heat recovery device mt
topic Waste heat recovery device
Leakage
Finite element simulation
Stress analysis
Failure analysis
Alkali stress corrosion
url http://www.jxqd.net.cn/thesisDetails#10.16579/j.issn.1001.9669.2023.02.028
work_keys_str_mv AT renziqi leakagefailureanalysisoftubebundleconnectionoffluegaswasteheatrecoverydevicemt
AT dongjinshan leakagefailureanalysisoftubebundleconnectionoffluegaswasteheatrecoverydevicemt
AT fengjun leakagefailureanalysisoftubebundleconnectionoffluegaswasteheatrecoverydevicemt
AT dingyi leakagefailureanalysisoftubebundleconnectionoffluegaswasteheatrecoverydevicemt