Treatment of Vibration Problem in Hydro-generator Group in Xiangshui Hydropower Station
Saved in:
| Main Authors: | BI Ren-you, LI Xu, LI Xun-xin |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2009-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47662014&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An SVDD-based post-processing approach for vibration risk assessment of the hydro-turbine-generator in a large hydropower station
by: Jinliang Zhang, et al.
Published: (2021-09-01) -
Optimal Scheduling Strategy for Wind-Solar-Hydro Alliance Considering Compensation of Regulation by Hydropower
by: Xianshan LI, et al.
Published: (2024-05-01) -
A Group Search Algorithm for Optimal Scheduling of Cascade Hydropower Stations
by: WANG Kechao, et al.
Published: (2025-06-01) -
A Group Search Algorithm for Optimal Scheduling of Cascade Hydropower Stations
by: WANG Kechao, et al.
Published: (2025-01-01) -
Engineering Geologic Problems and Treatment Measures for Intake Towers Foundation of Baise Hydropower Station
by: YU Hua-zhu
Published: (2006-01-01)