APA (7th ed.) Citation

Shi, X., Wang, Y., Zhou, Z., & Huang, L. Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation. MDPI AG.

Chicago Style (17th ed.) Citation

Shi, Xiangyang, Yunxing Wang, Ziqiang Zhou, and Long Huang. Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation. MDPI AG.

MLA (9th ed.) Citation

Shi, Xiangyang, et al. Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation. MDPI AG.

Warning: These citations may not always be 100% accurate.