Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario
Tunnel construction, a critical aspect of railway engineering, is a repetitive process with distinct linear characteristics. While the Linear Scheduling Method (LSM) is widely used for scheduling optimization in linear projects, it struggles to accommodate dynamic construction sequences, reverse con...