Analisis Ketersediaan Pasokan Listrik di PT PLN (Persero) UPK Teluk Sirih dengan Metoda Lean Six Sigma
<p>This research was conducted to analyze electricity supply availability from the steam power plant at PLN Teluk Sirih. This electricity supply availability is also called the equivalent availability factor (EAF). The regular efforts made to maintain the EAF at PLN are still corrective, by re...
Saved in:
Main Authors: | Muhammad Dani Gitatisna, Agus Sutanto |
---|---|
Format: | Article |
Language: | English |
Published: |
Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas
2021-04-01
|
Series: | Metal: Jurnal Sistem Mekanik dan Termal |
Subjects: | |
Online Access: | https://metal.ft.unand.ac.id/index.php/metal/article/view/147 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Strategi Komunikasi Hadapi Penolakan Pemanfaatan Energi Nuklir sebagai Pembangkit Listrik di Indonesia
by: Syahdino Pratama, et al.
Published: (2024-08-01) -
Pengaruh Ketersediaan Sumber Belajar dan Dukungan Dosen terhadap Motivasi Belajar Bahasa Arab Mahasiswa Pascasarjana UIN Malang
by: Nurul Aini, et al.
Published: (2025-01-01) -
Sistem Monitoring Trafo Distribusi PT.PLN (Persero) berbasis IoT
by: Budi Eko Prasetyo, et al.
Published: (2020-02-01) -
Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
by: Februarman Februarman, et al.
Published: (2023-12-01) -
Synthesis of ZnO nanoparticles from electric arc furnace dust
by: Bui A.-H., et al.
Published: (2022-01-01)