Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System

During the early operation stage of Qingdao metro line 2, the trains were delayed many times caused by sliding plug door fault. To assure the train's safety operation, this paper focused on the typical faults in the early operation stage of Qingdao metro line 2, analyzed the faults from train o...

Full description

Saved in:
Bibliographic Details
Main Authors: Jizhen HU, Changyi GONG, Wenchao WANG
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2021-03-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.02.005
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850142827778932736
author Jizhen HU
Changyi GONG
Wenchao WANG
author_facet Jizhen HU
Changyi GONG
Wenchao WANG
author_sort Jizhen HU
collection DOAJ
description During the early operation stage of Qingdao metro line 2, the trains were delayed many times caused by sliding plug door fault. To assure the train's safety operation, this paper focused on the typical faults in the early operation stage of Qingdao metro line 2, analyzed the faults from train operation conditions, control logic of the faults and faults active conditions, summarized the root cause of the faults in detail, and provided the corresponding improvement measures accordingly. It was proved that these measures could decrease the door fault rate, and improve the operation reliability of the metro trains. This research provided valuable reference for other metro projects in installation, commissioning and maintenance, and provided basis for quick fault location and treatment.
format Article
id doaj-art-57b933d9141c48788fd2a8e4c3f09dc8
institution OA Journals
issn 1000-128X
language zho
publishDate 2021-03-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-57b933d9141c48788fd2a8e4c3f09dc82025-08-20T02:28:55ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2021-03-01263020920207Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door SystemJizhen HUChangyi GONGWenchao WANGDuring the early operation stage of Qingdao metro line 2, the trains were delayed many times caused by sliding plug door fault. To assure the train's safety operation, this paper focused on the typical faults in the early operation stage of Qingdao metro line 2, analyzed the faults from train operation conditions, control logic of the faults and faults active conditions, summarized the root cause of the faults in detail, and provided the corresponding improvement measures accordingly. It was proved that these measures could decrease the door fault rate, and improve the operation reliability of the metro trains. This research provided valuable reference for other metro projects in installation, commissioning and maintenance, and provided basis for quick fault location and treatment.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.02.005metrodoor controllerfault diagnosticsliding plug doorobstacle
spellingShingle Jizhen HU
Changyi GONG
Wenchao WANG
Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
机车电传动
metro
door controller
fault diagnostic
sliding plug door
obstacle
title Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
title_full Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
title_fullStr Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
title_full_unstemmed Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
title_short Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System
title_sort fault analysis of qingdao metro line 2 sliding plug door system
topic metro
door controller
fault diagnostic
sliding plug door
obstacle
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.02.005
work_keys_str_mv AT jizhenhu faultanalysisofqingdaometroline2slidingplugdoorsystem
AT changyigong faultanalysisofqingdaometroline2slidingplugdoorsystem
AT wenchaowang faultanalysisofqingdaometroline2slidingplugdoorsystem