Automated Tool for the Comparative Estimation of Earthmoving Productivity
This paper presents an automated tool for comparative estimates of earthmoving productivity, focusing on excavation operations. The developed system includes three modules (computational, data storage, operational) and a series of forms that estimate construction productivity for three types of equi...
Saved in:
| Main Authors: | Antonios Panas, Nikolaos Kalaitzakis, John-Paris Pantouvakis |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Engineering, Project, and Production Management (EPPM)
2024-09-01
|
| Series: | Journal of Engineering, Project, and Production Management |
| Subjects: | |
| Online Access: | http://www.ppml.url.tw/EPPM_Journal/volumns/14_03_September_2024/ID_20230086.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Influence of Horizontal Distance Between Earthmoving Vehicle Load and Deep Excavation on Support Structure Response
by: Ping Zhao, et al.
Published: (2024-11-01) -
Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming
by: Kheang Ngov, et al.
Published: (2025-03-01) -
Automated Design and Parametric Modeling of Excavator Buckets
by: Nikolay Stankov, et al.
Published: (2025-03-01) -
Ground-Level Surface Reconstruction and Soil Volume Estimation in Construction Sites Using Marching Cubes Method
by: Fattah Hanafi Sheikhha, et al.
Published: (2025-07-01) -
Remediation of uncontrolled inflows caused by technical failures in deep excavations
by: Alejandro J. Ferrer Granell, et al.
Published: (2025-09-01)