Economic limit calculate method of blocked layer released by water flood wells.

Daqing Oilfield is in the forefront, because of polymer flooding well pattern was used to next production layer, so, first development layer was sealed after polymer well was used to next layer, and whose storage reserves is very huge. To 2021, OOIP of the first set of reserves of type II reservoirs...

Full description

Saved in:
Bibliographic Details
Main Author: Fulin Wang
Format: Article
Language:English
Published: Public Library of Science (PLoS) 2025-01-01
Series:PLoS ONE
Online Access:https://doi.org/10.1371/journal.pone.0319186
Tags: Add Tag
No Tags, Be the first to tag this record!