Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge

The immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge adopts the construction mode of sinking from the east and west artificial islands to the middle to form a closed dragon mouth, and then sinking the final joint through. The final joint state parameter measurement is the key factor determining...

Full description

Saved in:
Bibliographic Details
Main Authors: SUO Xuhong, LIU Guohui, ZHANG Dejin, GUAN Minglei
Format: Article
Language:English
Published: Science Press (China Science Publishing & Media Ltd.) 2022-07-01
Series:Shenzhen Daxue xuebao. Ligong ban
Subjects:
Online Access:https://journal.szu.edu.cn/en/#/digest?ArticleID=2441
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850027579154628608
author SUO Xuhong
LIU Guohui
ZHANG Dejin
GUAN Minglei
author_facet SUO Xuhong
LIU Guohui
ZHANG Dejin
GUAN Minglei
author_sort SUO Xuhong
collection DOAJ
description The immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge adopts the construction mode of sinking from the east and west artificial islands to the middle to form a closed dragon mouth, and then sinking the final joint through. The final joint state parameter measurement is the key factor determining the success or failure of the project. Aiming at the problems of low efficiency, low measurement accuracy, poor reliability and inability to adjust the state of the closure in real time, this paper proposes a real-time measurement method for the formation of the closure state. Firstly, the measurement feature points are arranged on the end faces of the two pipe joints that form the closure, and the coordinates of the feature points in the pipe joint coordinate system are obtained by measurement. Secondly, in the process of sinking and laying, the measuring tower method and the manhole casting point method are used to measure and adjust the state of the closing mouth. Finally, the three measurement results are uniformly converted into the engineering coordinate system, and the accuracy is compared and analyzed by using the measurement error transfer model, and the best measurement method for the closing state of the immersed tunnel construction is obtained. This method changes the construction method of forming closure first, then measuring through and then adjusting accurately in the construction of immersed tunnels, and provides a reference for large-scale underwater installation projects such as immersed tube tunnels and underwater pipes.
format Article
id doaj-art-5398fb9142744f148efa048244f742e0
institution DOAJ
issn 1000-2618
language English
publishDate 2022-07-01
publisher Science Press (China Science Publishing & Media Ltd.)
record_format Article
series Shenzhen Daxue xuebao. Ligong ban
spelling doaj-art-5398fb9142744f148efa048244f742e02025-08-20T03:00:06ZengScience Press (China Science Publishing & Media Ltd.)Shenzhen Daxue xuebao. Ligong ban1000-26182022-07-0139440240810.3724/SP.J.1249.2022.044021000-2618(2022)04-0402-07Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao BridgeSUO XuhongLIU GuohuiZHANG DejinGUAN MingleiThe immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge adopts the construction mode of sinking from the east and west artificial islands to the middle to form a closed dragon mouth, and then sinking the final joint through. The final joint state parameter measurement is the key factor determining the success or failure of the project. Aiming at the problems of low efficiency, low measurement accuracy, poor reliability and inability to adjust the state of the closure in real time, this paper proposes a real-time measurement method for the formation of the closure state. Firstly, the measurement feature points are arranged on the end faces of the two pipe joints that form the closure, and the coordinates of the feature points in the pipe joint coordinate system are obtained by measurement. Secondly, in the process of sinking and laying, the measuring tower method and the manhole casting point method are used to measure and adjust the state of the closing mouth. Finally, the three measurement results are uniformly converted into the engineering coordinate system, and the accuracy is compared and analyzed by using the measurement error transfer model, and the best measurement method for the closing state of the immersed tunnel construction is obtained. This method changes the construction method of forming closure first, then measuring through and then adjusting accurately in the construction of immersed tunnels, and provides a reference for large-scale underwater installation projects such as immersed tube tunnels and underwater pipes.https://journal.szu.edu.cn/en/#/digest?ArticleID=2441engineering surveyhong kong-zhuhai-macao bridgeimmersed tunnelfinal closuresurvey towermanhole well casting pointpenetration survey
spellingShingle SUO Xuhong
LIU Guohui
ZHANG Dejin
GUAN Minglei
Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge
Shenzhen Daxue xuebao. Ligong ban
engineering survey
hong kong-zhuhai-macao bridge
immersed tunnel
final closure
survey tower
manhole well casting point
penetration survey
title Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge
title_full Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge
title_fullStr Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge
title_full_unstemmed Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge
title_short Closure state measurement of final joint of the immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge
title_sort closure state measurement of final joint of the immersed tunnel of the hong kong zhuhai macao bridge
topic engineering survey
hong kong-zhuhai-macao bridge
immersed tunnel
final closure
survey tower
manhole well casting point
penetration survey
url https://journal.szu.edu.cn/en/#/digest?ArticleID=2441
work_keys_str_mv AT suoxuhong closurestatemeasurementoffinaljointoftheimmersedtunnelofthehongkongzhuhaimacaobridge
AT liuguohui closurestatemeasurementoffinaljointoftheimmersedtunnelofthehongkongzhuhaimacaobridge
AT zhangdejin closurestatemeasurementoffinaljointoftheimmersedtunnelofthehongkongzhuhaimacaobridge
AT guanminglei closurestatemeasurementoffinaljointoftheimmersedtunnelofthehongkongzhuhaimacaobridge