Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics
The unbalanced mining replacement is a major problem restricting efficient mining. The optimization of mining replacement process can achieve perfect coordination of mining face and tunneling in time and ensure the efficient production of mine to the greatest extent. Based on this, this paper takes...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/9636178 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1849406832453353472 |
|---|---|
| author | Shuheng Zhong Yuchen Guo Yanjiao Li Ming Yang |
| author_facet | Shuheng Zhong Yuchen Guo Yanjiao Li Ming Yang |
| author_sort | Shuheng Zhong |
| collection | DOAJ |
| description | The unbalanced mining replacement is a major problem restricting efficient mining. The optimization of mining replacement process can achieve perfect coordination of mining face and tunneling in time and ensure the efficient production of mine to the greatest extent. Based on this, this paper takes Wangzhuang Mine as the research background, applies system dynamics to mining replacement research, builds the Wangzhuang Mine mining-driving system simulation model, and uses this model to dynamically simulate the working face 9102 and its replaced heading face 7106. The research has found that there is an imbalance in the replacement between the two working faces, and the replacement process can be optimized by advancing the driving period or increasing the driving team to work in parallel at the appropriate time point, so as to meet the normal demand of mining replacement and provide guidance for the mining plan arrangement of other similar working faces. |
| format | Article |
| id | doaj-art-50982cce85cc4c54b4119e9b0d8856ef |
| institution | Kabale University |
| issn | 1687-8086 1687-8094 |
| language | English |
| publishDate | 2021-01-01 |
| publisher | Wiley |
| record_format | Article |
| series | Advances in Civil Engineering |
| spelling | doaj-art-50982cce85cc4c54b4119e9b0d8856ef2025-08-20T03:36:15ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/96361789636178Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System DynamicsShuheng Zhong0Yuchen Guo1Yanjiao Li2Ming Yang3School of Energy and Mining, China University of Mining and Technology (Beijing), Beijing 10083, ChinaSchool of Energy and Mining, China University of Mining and Technology (Beijing), Beijing 10083, ChinaSchool of Energy and Mining, China University of Mining and Technology (Beijing), Beijing 10083, ChinaSchool of Information Network Security, People’s Public Security University of China, Beijing 10083, ChinaThe unbalanced mining replacement is a major problem restricting efficient mining. The optimization of mining replacement process can achieve perfect coordination of mining face and tunneling in time and ensure the efficient production of mine to the greatest extent. Based on this, this paper takes Wangzhuang Mine as the research background, applies system dynamics to mining replacement research, builds the Wangzhuang Mine mining-driving system simulation model, and uses this model to dynamically simulate the working face 9102 and its replaced heading face 7106. The research has found that there is an imbalance in the replacement between the two working faces, and the replacement process can be optimized by advancing the driving period or increasing the driving team to work in parallel at the appropriate time point, so as to meet the normal demand of mining replacement and provide guidance for the mining plan arrangement of other similar working faces.http://dx.doi.org/10.1155/2021/9636178 |
| spellingShingle | Shuheng Zhong Yuchen Guo Yanjiao Li Ming Yang Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics Advances in Civil Engineering |
| title | Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics |
| title_full | Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics |
| title_fullStr | Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics |
| title_full_unstemmed | Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics |
| title_short | Research on Optimization of Mining Substitution in Wangzhuang Mine Based on System Dynamics |
| title_sort | research on optimization of mining substitution in wangzhuang mine based on system dynamics |
| url | http://dx.doi.org/10.1155/2021/9636178 |
| work_keys_str_mv | AT shuhengzhong researchonoptimizationofminingsubstitutioninwangzhuangminebasedonsystemdynamics AT yuchenguo researchonoptimizationofminingsubstitutioninwangzhuangminebasedonsystemdynamics AT yanjiaoli researchonoptimizationofminingsubstitutioninwangzhuangminebasedonsystemdynamics AT mingyang researchonoptimizationofminingsubstitutioninwangzhuangminebasedonsystemdynamics |