Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming
Earthmoving operations generally account for about a quarter of the construction budget in high-way constructions. Feasible planning is thus required for delivering the successful performance of such projects. Selecting the best fleet for the operation is one of the crucial factors affecting both du...
Saved in:
| Main Authors: | Kheang Ngov, Yongho Ko, Jaeyun Noh, Sumin Lee, Seungwoo Han |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Taylor & Francis Group
2025-03-01
|
| Series: | Journal of Asian Architecture and Building Engineering |
| Subjects: | |
| Online Access: | http://dx.doi.org/10.1080/13467581.2024.2320321 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Influence of Horizontal Distance Between Earthmoving Vehicle Load and Deep Excavation on Support Structure Response
by: Ping Zhao, et al.
Published: (2024-11-01) -
Automated Tool for the Comparative Estimation of Earthmoving Productivity
by: Antonios Panas, et al.
Published: (2024-09-01) -
SIMULATION OF THE CONTACT PROCESS INTERACTIONS OF LAND-MOVING AND EARTH-TRANSPORT MACHINES’ WORKING BODIES WITH FROZEN SOIL
by: V. N. Kuznetsova, et al.
Published: (2018-05-01) -
INVESTIGATION OF DIGGING MACHINES FOR CONSTRUCTION BY THE “DIAPHRAGM WALL” METHOD
by: A. S. Kadyrov, et al.
Published: (2018-07-01) -
Characteristics determination for milling working equipment of excavator
by: I. S. Kuznetsov, et al.
Published: (2023-07-01)