A bi-objective optimization framework for configuration of battery energy storage system considering energy loss and economy

To address a bi-objective optimization configuration problem of battery energy storage system (BESS) in distributed energy system (DES) considering energy loss and economy, a perturbation and observation approach (P&O) is proposed in this article. First, in a DES, the configuration model of BESS...

Full description

Saved in:
Bibliographic Details
Main Authors: Suliang Ma, Zeqing Meng, Yiwen Wu, Dixi Xin
Format: Article
Language:English
Published: SAGE Publishing 2025-03-01
Series:Energy Exploration & Exploitation
Online Access:https://doi.org/10.1177/01445987241295792
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:To address a bi-objective optimization configuration problem of battery energy storage system (BESS) in distributed energy system (DES) considering energy loss and economy, a perturbation and observation approach (P&O) is proposed in this article. First, in a DES, the configuration model of BESS is established. Then, a novel way is designed that transforming a bi-objective optimization problem into a single objective optimization problem with variable conditions. And the P&O process of the proposed method is presented. Finally, in a simulation case, compared with a single optimization objective of energy loss or economy, the P&O method improves 5.71-fold or 2.94-fold in each direction, respectively and effectively balances the contradiction between them. In addition, with the efficiency and electricity cost of BESS increasing, the rated capacity of BESS changes by approximately 10%. And the location is a key factor affecting the configuration scheme of BESS in DES.
ISSN:0144-5987
2048-4054