ESTIMATION OF ECONOMIC EXPEDIENCY OF «BRIDGE-PRE-BRIDGE TERRITORY» SYSTEM
The paper considers principles that form «Bridge-Pre-Bridge Territory» system. The method is proposed for calculation of expenses on technical research for development of projects on usage of pre-bridge territories. Usage of site class number for natural conditions makes it possible to estimate inve...
Saved in:
| Main Authors: | A. A. Lapko, V. E. Khizhniak, E. S. Agranovich-Ponomaryova |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Belarusian National Technical University
2008-04-01
|
| Series: | Наука и техника |
| Online Access: | https://sat.bntu.by/jour/article/view/701 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Clinical and Economic Expedience of Ertapenem Therapy of Complicated Urinary Tract Infection
by: A. S. Kolbin, et al.
Published: (2020-05-01) -
On Expediency to Reduce Inductive Impedance in Power Transmission
by: E. G. Pospelov, et al.
Published: (2006-04-01) -
Land Reform in Zimbabwe: a Balance of Political Expediency and Economic Inevitability?
by: PROKOPENKO Liubov Yaroslavovna
Published: (2020-07-01) -
The technical- economic report on designing of bridge cranes
by: N. S. Galdin, et al.
Published: (2017-08-01) -
Reform of the bridging pension system – new rights and their economic consequences
by: Kolek Antoni Jerzy
Published: (2025-03-01)