Automatic Roadway Backfilling of Caving Gangue for Cutting Roofs by Combined Support on Gob-Side Entry Retaining with No-Pillars: A Case Study
Automatic roadways on gob-side entry retaining with no-pillars are used for longwall mining technology. The mining technology with no-pillars can recover coal pillar resources and reduce the amount and cost of roadway excavations. Automatic roadway technology for cutting roofs by combined support on...
Saved in:
Main Authors: | Shengrong Xie, Xiaoyu Wu, Dongdong Chen, Yaohui Sun, Junchao Zeng, Qing Zhang, Chunwei Ji, Qiong Cheng, En Wang, Yuxin Ren |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Advances in Materials Science and Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/8736103 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An Experimental Investigation on the Mechanical Properties of Gangue Concrete as a Roadside Support Body Material for Backfilling Gob-Side Entry Retaining
by: Peng Gong, et al.
Published: (2018-01-01) -
Three-Dimensional Physical Simulation and Control Technology of Roof Movement Characteristics in Non-Pillar Gob-Side Entry Retaining by Roof Cutting
by: Xinzhu Hua, et al.
Published: (2021-01-01) -
Study on Stability Control of Retained Gob-Side Entry by Blasting Fracturing Roof Technology in Thick Immediate Roof
by: Jingang Guo, et al.
Published: (2021-01-01) -
Study on the Support System Mechanism of Entry Roof with Roof Cutting Pressure Releasing Gob-Side Entry Retaining Technology
by: Xingen Ma, et al.
Published: (2022-01-01) -
Study on the Stability and Control of Gob-Side Entry Retaining in Paste Backfill Working Face
by: Changtao Xu, et al.
Published: (2025-01-01)