Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below
The vibration effect generated during tunnel excavation can influence or damage adjacent tunnels. Studying and controlling the blasting vibration effect has important theoretical and practical significance, especially for new tunnels. This paper takes the tunnel project of Gao Jiu Lu-Jia Hua Cross T...
Saved in:
| Main Authors: | Baofu Duan, Weizeng Gong, Guoshan Ta, Xuxu Yang, Xuewei Zhang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2019/4970269 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research and Analysis on the Influence of Small Clear Distance Drilling and Blasting Method on the Existing Tunnel Structure
by: Haibin Huang, et al.
Published: (2021-01-01) -
Study on the Influence of the Blasting of Preceding Tunnel on the Pre-Penetration Surrounding Rock in Succeeding Tunnel with Small Clear Distance
by: Xiankai Bao, et al.
Published: (2022-01-01) -
Numerical Evaluation on Dynamic Response of Existing Underlying Tunnel Induced by Blasting Excavation of a Subway Tunnel
by: Jixue Zhou, et al.
Published: (2017-01-01) -
Safety Threshold Determination for Blasting Vibration of the Lining in Existing Tunnels under Adjacent Tunnel Blasting
by: Fei Xue, et al.
Published: (2019-01-01) -
Damage Mechanism of Surrounding Rock under Blasting Excavation of the Tunnel
by: Yaoxin Li, et al.
Published: (2024-01-01)