Prediction Method of TBM Tunneling Parameters Based on Bi-GRU-ATT Model
With tunnel boring machines (TBMs) widely used in tunnel construction, the adaptable adjustment of TBM operating status has become a research focus. Since the prediction of tunnel geological conditions is still challenging before excavating, the prediction of important TBM operating parameters plays...
Saved in:
Main Authors: | Qinglong Zhang, Boyu Yang, Yanwen Zhu, Chen Guo, Chong Jiao, Anmin Cai |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/3743472 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research on Stratum Identification Method Based on TBM Tunneling Characteristic Parameters
by: Wei Wu, et al.
Published: (2022-01-01) -
Big Data-Based Boring Indexes and Their Application during TBM Tunneling
by: Shuangjing Wang, et al.
Published: (2021-01-01) -
Experimental Study on the Evolution of Argillization of Mudstone and Cutter Wear during the TBM Tunnelling
by: Kanglei Song, et al.
Published: (2021-01-01) -
Kinematics and spatial structure analysis of TBM gunite robot based on D–H parameter method
by: Lianhui Jia, et al.
Published: (2024-06-01) -
Emission prediction and optimization of methanol/diesel dual-fuel engines based on ITransformer-BiGRU and NSGA-III
by: Mingzhang Pan, et al.
Published: (2025-01-01)