Research of Dual-signal System for Urban Train

According to architecture of on-board signal equipment, and based on various signal systems’ characteristics and application requirement,shared probability of signal equipment and other related equipment was analyzed, and possible installation position of dual signal systems was provided. Electrical...

Full description

Saved in:
Bibliographic Details
Main Author: ZHAO Xiaofeng
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2014-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2014.06.103
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849728845152780288
author ZHAO Xiaofeng
author_facet ZHAO Xiaofeng
author_sort ZHAO Xiaofeng
collection DOAJ
description According to architecture of on-board signal equipment, and based on various signal systems’ characteristics and application requirement,shared probability of signal equipment and other related equipment was analyzed, and possible installation position of dual signal systems was provided. Electrical interface of the signal system was discussed, a cutover method of which was presented. The project above was applied and validated in the train on Shanghai Zhangjiang test line.
format Article
id doaj-art-4d2fb2084c8e46f59f5e788a34c7c663
institution DOAJ
issn 1000-128X
language zho
publishDate 2014-01-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-4d2fb2084c8e46f59f5e788a34c7c6632025-08-20T03:09:25ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2014-01-01717420909471Research of Dual-signal System for Urban TrainZHAO XiaofengAccording to architecture of on-board signal equipment, and based on various signal systems’ characteristics and application requirement,shared probability of signal equipment and other related equipment was analyzed, and possible installation position of dual signal systems was provided. Electrical interface of the signal system was discussed, a cutover method of which was presented. The project above was applied and validated in the train on Shanghai Zhangjiang test line.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2014.06.103on-board signal systemrolling stock interfacedual signal systems cutoverdriverless automatic turn-backdual speed sensors on one axle
spellingShingle ZHAO Xiaofeng
Research of Dual-signal System for Urban Train
机车电传动
on-board signal system
rolling stock interface
dual signal systems cutover
driverless automatic turn-back
dual speed sensors on one axle
title Research of Dual-signal System for Urban Train
title_full Research of Dual-signal System for Urban Train
title_fullStr Research of Dual-signal System for Urban Train
title_full_unstemmed Research of Dual-signal System for Urban Train
title_short Research of Dual-signal System for Urban Train
title_sort research of dual signal system for urban train
topic on-board signal system
rolling stock interface
dual signal systems cutover
driverless automatic turn-back
dual speed sensors on one axle
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2014.06.103
work_keys_str_mv AT zhaoxiaofeng researchofdualsignalsystemforurbantrain