A dynamic method for rolling transport network planning
Operators are facing double pressure of the rapid development of network and the drop of telecom charges.The construction of the transport network needs to consider the long-term development.The construction plan can not only meet the business needs of the near future,but also meet the future direct...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Beijing Xintong Media Co., Ltd
2017-09-01
|
Series: | Dianxin kexue |
Subjects: | |
Online Access: | http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2017230/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841530125763477504 |
---|---|
author | Yun XIA Ji’en SONG Jie LI |
author_facet | Yun XIA Ji’en SONG Jie LI |
author_sort | Yun XIA |
collection | DOAJ |
description | Operators are facing double pressure of the rapid development of network and the drop of telecom charges.The construction of the transport network needs to consider the long-term development.The construction plan can not only meet the business needs of the near future,but also meet the future direction of business development.By analyzing the shortage of traditional rolling planning method,oriented by planning development goals,a dynamic rolling planning method of transport network was presented.The effect of the business developing trend to the network was transformed from the artificial fuzzy thinking into quantitative calculation method,to avoid investment waste caused by inconformity of network construction and business changes. |
format | Article |
id | doaj-art-4a8a558cf39c414c95ede69626bca820 |
institution | Kabale University |
issn | 1000-0801 |
language | zho |
publishDate | 2017-09-01 |
publisher | Beijing Xintong Media Co., Ltd |
record_format | Article |
series | Dianxin kexue |
spelling | doaj-art-4a8a558cf39c414c95ede69626bca8202025-01-15T03:12:12ZzhoBeijing Xintong Media Co., LtdDianxin kexue1000-08012017-09-013314815459600284A dynamic method for rolling transport network planningYun XIAJi’en SONGJie LIOperators are facing double pressure of the rapid development of network and the drop of telecom charges.The construction of the transport network needs to consider the long-term development.The construction plan can not only meet the business needs of the near future,but also meet the future direction of business development.By analyzing the shortage of traditional rolling planning method,oriented by planning development goals,a dynamic rolling planning method of transport network was presented.The effect of the business developing trend to the network was transformed from the artificial fuzzy thinking into quantitative calculation method,to avoid investment waste caused by inconformity of network construction and business changes.http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2017230/transport networkdynamicrolling planning methodintelligent planning tool |
spellingShingle | Yun XIA Ji’en SONG Jie LI A dynamic method for rolling transport network planning Dianxin kexue transport network dynamic rolling planning method intelligent planning tool |
title | A dynamic method for rolling transport network planning |
title_full | A dynamic method for rolling transport network planning |
title_fullStr | A dynamic method for rolling transport network planning |
title_full_unstemmed | A dynamic method for rolling transport network planning |
title_short | A dynamic method for rolling transport network planning |
title_sort | dynamic method for rolling transport network planning |
topic | transport network dynamic rolling planning method intelligent planning tool |
url | http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2017230/ |
work_keys_str_mv | AT yunxia adynamicmethodforrollingtransportnetworkplanning AT jiensong adynamicmethodforrollingtransportnetworkplanning AT jieli adynamicmethodforrollingtransportnetworkplanning AT yunxia dynamicmethodforrollingtransportnetworkplanning AT jiensong dynamicmethodforrollingtransportnetworkplanning AT jieli dynamicmethodforrollingtransportnetworkplanning |