Post-Handover Quality Management Index of Electric Housing Work

Since housing electrical work is essential in the aspect of electricity use and electrical accidents, it is necessary to properly design, construct, and manage it to avoid quality problems. However, disputes are intensifying in Korea due to numerous quality problems after the house is handed over to...

Full description

Saved in:
Bibliographic Details
Main Authors: Junmo Park, Deokseok Seo
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2022/4690073
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832550753398423552
author Junmo Park
Deokseok Seo
author_facet Junmo Park
Deokseok Seo
author_sort Junmo Park
collection DOAJ
description Since housing electrical work is essential in the aspect of electricity use and electrical accidents, it is necessary to properly design, construct, and manage it to avoid quality problems. However, disputes are intensifying in Korea due to numerous quality problems after the house is handed over to the owner. Although related standards have been established and some studies have been conducted, there is a lack of discussion on housing electrical work because the housing quality problem is varied. In this study, the cases of quality problems that occurred in housing electrical works were investigated, while 52 quality control indices were presented and classified according to detailed work category, object, and problematic occurrences. In addition, the number of cases of quality problems for each quality management index and the repair cost ratio were used as a scale to understand the status of quality management. Finally, 11 quality indices were suggested as candidates of important indices which needed to be controlled to focus on the housing electrical work by comparing the above 52 indices. The comparison was made on which one was best suited to the Pareto principle, a quality management strategy, among the candidates for the critical index and the indices suggested by relevant standards and previous studies. The comparison results showed that the candidates of the essential indices suggested in this study conformed to the Pareto principle, while other indices hardly conformed to it. Therefore, if the quality control strategy of choice and concentration for housing electrical works is used, focusing on these vital index candidates can effectively assist in handling the occurrence of quality problems.
format Article
id doaj-art-49d12188be1540fdadc0c746f90152af
institution Kabale University
issn 1687-8094
language English
publishDate 2022-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-49d12188be1540fdadc0c746f90152af2025-02-03T06:05:51ZengWileyAdvances in Civil Engineering1687-80942022-01-01202210.1155/2022/4690073Post-Handover Quality Management Index of Electric Housing WorkJunmo Park0Deokseok Seo1School of ArchitectureSchool of ArchitectureSince housing electrical work is essential in the aspect of electricity use and electrical accidents, it is necessary to properly design, construct, and manage it to avoid quality problems. However, disputes are intensifying in Korea due to numerous quality problems after the house is handed over to the owner. Although related standards have been established and some studies have been conducted, there is a lack of discussion on housing electrical work because the housing quality problem is varied. In this study, the cases of quality problems that occurred in housing electrical works were investigated, while 52 quality control indices were presented and classified according to detailed work category, object, and problematic occurrences. In addition, the number of cases of quality problems for each quality management index and the repair cost ratio were used as a scale to understand the status of quality management. Finally, 11 quality indices were suggested as candidates of important indices which needed to be controlled to focus on the housing electrical work by comparing the above 52 indices. The comparison was made on which one was best suited to the Pareto principle, a quality management strategy, among the candidates for the critical index and the indices suggested by relevant standards and previous studies. The comparison results showed that the candidates of the essential indices suggested in this study conformed to the Pareto principle, while other indices hardly conformed to it. Therefore, if the quality control strategy of choice and concentration for housing electrical works is used, focusing on these vital index candidates can effectively assist in handling the occurrence of quality problems.http://dx.doi.org/10.1155/2022/4690073
spellingShingle Junmo Park
Deokseok Seo
Post-Handover Quality Management Index of Electric Housing Work
Advances in Civil Engineering
title Post-Handover Quality Management Index of Electric Housing Work
title_full Post-Handover Quality Management Index of Electric Housing Work
title_fullStr Post-Handover Quality Management Index of Electric Housing Work
title_full_unstemmed Post-Handover Quality Management Index of Electric Housing Work
title_short Post-Handover Quality Management Index of Electric Housing Work
title_sort post handover quality management index of electric housing work
url http://dx.doi.org/10.1155/2022/4690073
work_keys_str_mv AT junmopark posthandoverqualitymanagementindexofelectrichousingwork
AT deokseokseo posthandoverqualitymanagementindexofelectrichousingwork