Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
There are many advantages of reasonably determining the affected zone and its construction sequence for the multiline parallel pipe-jacking construction, such as convenient to reasonably arrange the pipeline section distribution mode, reducing the construction safety risk, and construction difficult...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2023/6667430 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!