Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
There are many advantages of reasonably determining the affected zone and its construction sequence for the multiline parallel pipe-jacking construction, such as convenient to reasonably arrange the pipeline section distribution mode, reducing the construction safety risk, and construction difficult...
Saved in:
| Main Authors: | Zhang Ziguang, Mao Ruijin, Zhang Jiesheng, Wang Xuefeng, Zhang Mengqing |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2023/6667430 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on the Support Pressure of Tunnel Face for the Construction of Pipe-Jacking Across Thin Overburden River Channel Based on Mud-Water Balance
by: Ziguang Zhang, et al.
Published: (2025-06-01) -
Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels
by: HUANG Jianhua, et al.
Published: (2025-03-01) -
Riverbed Surface Settlement Patterns Induced by Pipe Jacking Construction in River-Crossing Sections
by: SHENG Song-tao, AN Zi-yue, ZHOU Hong-yun, LIU Jie
Published: (2025-07-01) -
Self‐Circulating Mud's Lubrication Application on Overlength Pipe Jacking Construction
by: Tianguo Tang, et al.
Published: (2025-04-01) -
Effect of Lubricant Young’s Modulus on Surface Settlement Control During Pipe-Roof Construction Using Pipe-Jacking Method
by: Shuai Zhang, et al.
Published: (2025-03-01)