Jianhua, H., Xiaoyu, Y., & Jiankun, Z. Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels. Urban Mass Transit Magazine Press.
Chicago Style (17th ed.) CitationJianhua, HUANG, YUAN Xiaoyu, and ZHANG Jiankun. Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels. Urban Mass Transit Magazine Press.
MLA (9th ed.) CitationJianhua, HUANG, et al. Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels. Urban Mass Transit Magazine Press.
Warning: These citations may not always be 100% accurate.