Operation Control Method for Degraded Trains after Shanghai Rail Transit Lines 3 and 4 Signaling System Upgrade and Renovation
Objective After the upgrade of Shanghai Rail Transit Lines 3 and 4 signaling systems, their functions are highly concentrated in the on-board train controller. In the event of on-board train controller failure leading to train degraded status, the operational capacity of the line will decrease signi...
Saved in:
| Main Author: | LI Yongzheng |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2024-11-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.11.006.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
by: SUN Yao, et al.
Published: (2024-10-01) -
Technical Analysis of Transition Switching Engineering in Urban Rail Transit Signaling System Upgrades
by: YE Fuzhi, et al.
Published: (2025-03-01) -
Signaling System Renovation Key Technology Solutions of Suzhou Rail Transit Line 11 and Line 3 for Through Train Operation
by: LIU Dongdong, et al.
Published: (2024-12-01) -
Practice and Reflection on Renovation of Shanghai Urban Rail Transit Existing Lines
by: WANG Sitao, et al.
Published: (2025-05-01) -
Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4
by: WANG Xin
Published: (2024-11-01)