Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches

[Objective] The rotary drilling process of bored cast-in-place piles will cause vibration to the existing underground buildings and structures. Therefore, it is necessary to study the vibration response of the strata and structures caused by the rotary drilling process. [Method] Taking a station fou...

Full description

Saved in:
Bibliographic Details
Main Author: NIE Peng
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-01-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.019.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841543680406585344
author NIE Peng
author_facet NIE Peng
author_sort NIE Peng
collection DOAJ
description [Objective] The rotary drilling process of bored cast-in-place piles will cause vibration to the existing underground buildings and structures. Therefore, it is necessary to study the vibration response of the strata and structures caused by the rotary drilling process. [Method] Taking a station foundation pit excavation project of Jinan Metro Line 4 as the background, through field tests and numerical simulation methods based on three-dimensional finite element models, the influence of soil layers and power pipe trenches vibration caused by rotary drilling construction is analyzed considering factors such as vibration source distance, burial depth, excavation depth, different power pipe trench positions, and the number of piles under simultaneous construction. [Result & Conclusion] The closer the soil and existing power pipe trench are to the vibration source, the greater the vibration effect they receive. The vibration effect on the soil and existing power pipe trenches can be ignored when the distance from the vibration source exceeds 6 m. The vibration effect on the soil shows a decreasing trend with the increase of burial depth. After the excavation depth reaches 12 m, the vibration impact on the shallow buried power pipe trench can be ignored. When the measuring point and the vibration source are at the same depth, the vibration impact at the measuring point is the greatest. With the decrease of the clearance between the two simultaneously-constructed piles, the vibration velocity peak value shows an increasing trend. When the net distance between two simultaneously-constructed piles is 10 m, the vibration coupling effect can be ignored.
format Article
id doaj-art-429f928012fb449496c5bd2df3fdee12
institution Kabale University
issn 1007-869X
language zho
publishDate 2025-01-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-429f928012fb449496c5bd2df3fdee122025-01-13T08:04:42ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-01-0128110811210.16037/j.1007-869x.2025.01.019Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe TrenchesNIE Peng0The 3rd Engineering Co, Ltd of China Railway 12th Bureau Group, 474250, Nanyang, China[Objective] The rotary drilling process of bored cast-in-place piles will cause vibration to the existing underground buildings and structures. Therefore, it is necessary to study the vibration response of the strata and structures caused by the rotary drilling process. [Method] Taking a station foundation pit excavation project of Jinan Metro Line 4 as the background, through field tests and numerical simulation methods based on three-dimensional finite element models, the influence of soil layers and power pipe trenches vibration caused by rotary drilling construction is analyzed considering factors such as vibration source distance, burial depth, excavation depth, different power pipe trench positions, and the number of piles under simultaneous construction. [Result & Conclusion] The closer the soil and existing power pipe trench are to the vibration source, the greater the vibration effect they receive. The vibration effect on the soil and existing power pipe trenches can be ignored when the distance from the vibration source exceeds 6 m. The vibration effect on the soil shows a decreasing trend with the increase of burial depth. After the excavation depth reaches 12 m, the vibration impact on the shallow buried power pipe trench can be ignored. When the measuring point and the vibration source are at the same depth, the vibration impact at the measuring point is the greatest. With the decrease of the clearance between the two simultaneously-constructed piles, the vibration velocity peak value shows an increasing trend. When the net distance between two simultaneously-constructed piles is 10 m, the vibration coupling effect can be ignored.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.019.htmlsubwayfoundation pitbored cast-in-place pilerotary drilling constructionvibration impact
spellingShingle NIE Peng
Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
Chengshi guidao jiaotong yanjiu
subway
foundation pit
bored cast-in-place pile
rotary drilling construction
vibration impact
title Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
title_full Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
title_fullStr Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
title_full_unstemmed Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
title_short Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
title_sort study on the vibration influence law of bored cast in place pile construction on existing strata and pipe trenches
topic subway
foundation pit
bored cast-in-place pile
rotary drilling construction
vibration impact
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.019.html
work_keys_str_mv AT niepeng studyonthevibrationinfluencelawofboredcastinplacepileconstructiononexistingstrataandpipetrenches