Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area

China’s western mining area is an arid and semiarid area with a fragile ecological environment, and the high-intensity mining activities aggravate ecological damage. Reasonable choice of the mining parameters (i.e., mining height, panel width, and advancing speed) can not only improve the mining eff...

Full description

Saved in:
Bibliographic Details
Main Authors: Xiang He, Cun Zhang, Penghua Han
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2020/8889663
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850110405863538688
author Xiang He
Cun Zhang
Penghua Han
author_facet Xiang He
Cun Zhang
Penghua Han
author_sort Xiang He
collection DOAJ
description China’s western mining area is an arid and semiarid area with a fragile ecological environment, and the high-intensity mining activities aggravate ecological damage. Reasonable choice of the mining parameters (i.e., mining height, panel width, and advancing speed) can not only improve the mining efficiency but also weaken the mining-induced deformation and failures of the overburden and surface. The statistical analysis of the relationship between the mining parameters and periodic weighting interval (PWI) proves that mining parameters have significant influence on overburden failure. In this study, the damage constitutive equation was derived, and the overburden damage degree was defined to quantitatively characterize mining-induced stratum damage in a three-dimensional space. FLAC3D numerical models embedded with a damage constitutive equation were built to compare the panel width effect and advancing speed effect between the overburden damage degree and the water-conducted fracture zone (WCFZ). The reasonable range for mining parameters of the panel 12401 was provided based on the fitting function of the overburden damage degree versus mining parameters. The field measurements were carried out on panel 12401 of the Shangwan coal mine, including the advancing speed, PWI, and ground crack development. The results show that, under constant engineering and geological conditions, the damage degree of overburden will be weakened by increasing the advancing speed, reducing the mining height, or shortening the panel width. The overburden damage degree is more accurate than the height of the water-conducted fractured zone. The reasonable mining parameters of the panel 12401 are 8.8 m in mining height, 300 m in panel width, and 13.47 to 20.58 m/d in advancing speed, respectively. The field measurement results of the PWI and ground cracks have verified the validity using the overburden damage degree to determine high-intensity mining parameters.
format Article
id doaj-art-42501c2bb0a741d5a09905a1b4ca981c
institution OA Journals
issn 1468-8115
1468-8123
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Geofluids
spelling doaj-art-42501c2bb0a741d5a09905a1b4ca981c2025-08-20T02:37:51ZengWileyGeofluids1468-81151468-81232020-01-01202010.1155/2020/88896638889663Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining AreaXiang He0Cun Zhang1Penghua Han2Beijing Key Laboratory for Precise Mining of Intergrown Energy and Resources, China University of Mining and Technology, Beijing 100083, ChinaBeijing Key Laboratory for Precise Mining of Intergrown Energy and Resources, China University of Mining and Technology, Beijing 100083, ChinaBeijing Key Laboratory for Precise Mining of Intergrown Energy and Resources, China University of Mining and Technology, Beijing 100083, ChinaChina’s western mining area is an arid and semiarid area with a fragile ecological environment, and the high-intensity mining activities aggravate ecological damage. Reasonable choice of the mining parameters (i.e., mining height, panel width, and advancing speed) can not only improve the mining efficiency but also weaken the mining-induced deformation and failures of the overburden and surface. The statistical analysis of the relationship between the mining parameters and periodic weighting interval (PWI) proves that mining parameters have significant influence on overburden failure. In this study, the damage constitutive equation was derived, and the overburden damage degree was defined to quantitatively characterize mining-induced stratum damage in a three-dimensional space. FLAC3D numerical models embedded with a damage constitutive equation were built to compare the panel width effect and advancing speed effect between the overburden damage degree and the water-conducted fracture zone (WCFZ). The reasonable range for mining parameters of the panel 12401 was provided based on the fitting function of the overburden damage degree versus mining parameters. The field measurements were carried out on panel 12401 of the Shangwan coal mine, including the advancing speed, PWI, and ground crack development. The results show that, under constant engineering and geological conditions, the damage degree of overburden will be weakened by increasing the advancing speed, reducing the mining height, or shortening the panel width. The overburden damage degree is more accurate than the height of the water-conducted fractured zone. The reasonable mining parameters of the panel 12401 are 8.8 m in mining height, 300 m in panel width, and 13.47 to 20.58 m/d in advancing speed, respectively. The field measurement results of the PWI and ground cracks have verified the validity using the overburden damage degree to determine high-intensity mining parameters.http://dx.doi.org/10.1155/2020/8889663
spellingShingle Xiang He
Cun Zhang
Penghua Han
Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area
Geofluids
title Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area
title_full Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area
title_fullStr Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area
title_full_unstemmed Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area
title_short Overburden Damage Degree-Based Optimization of High-Intensity Mining Parameters and Engineering Practices in China’s Western Mining Area
title_sort overburden damage degree based optimization of high intensity mining parameters and engineering practices in china s western mining area
url http://dx.doi.org/10.1155/2020/8889663
work_keys_str_mv AT xianghe overburdendamagedegreebasedoptimizationofhighintensityminingparametersandengineeringpracticesinchinaswesternminingarea
AT cunzhang overburdendamagedegreebasedoptimizationofhighintensityminingparametersandengineeringpracticesinchinaswesternminingarea
AT penghuahan overburdendamagedegreebasedoptimizationofhighintensityminingparametersandengineeringpracticesinchinaswesternminingarea