Investigation of the loading of hydraulic excavator working equipment

The relevance of the work is determined by the need to increase the efficiency of hydraulic excavators, on which the cost of mining significantly depends. The purpose of the work is to improve the working equipment of a hydraulic excavator and develop a methodology for determining rational parameter...

Full description

Saved in:
Bibliographic Details
Main Authors: Shestakov V.S., Teliman I.V., Bezkorovayny P.G.
Format: Article
Language:English
Published: T. F. Gorbachev Kuzbass State Technical University 2024-02-01
Series:Горное оборудование и электромеханика
Subjects:
Online Access:https://gormash.kuzstu.ru/index.php?page=article&id=4368
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850068766521556992
author Shestakov V.S.
Teliman I.V.
Bezkorovayny P.G.
author_facet Shestakov V.S.
Teliman I.V.
Bezkorovayny P.G.
author_sort Shestakov V.S.
collection DOAJ
description The relevance of the work is determined by the need to increase the efficiency of hydraulic excavators, on which the cost of mining significantly depends. The purpose of the work is to improve the working equipment of a hydraulic excavator and develop a methodology for determining rational parameters that ensure a reduction in its weight. A scheme of working equipment is proposed with the exception of hydraulic cylinders for turning the boom in comparison with the traditional scheme and with a pressure mechanism with a pressure rod located on the superstructure on the axis of rotation. This scheme makes it possible to increase the capacity of the bucket and thereby the productivity of the excavator. A method for determining the design parameters of an excavator is presented, which ensures that the sections of the boom and arm are determined without “excessive” safety margins and thereby obtaining a minimum mass. At the same time, if you leave the tipping moment the same as that of the base model, then it will be possible to increase the capacity of the bucket and the productivity of the excavator. The EG-110 hydraulic excavator was taken as the base object used for comparison with the proposed design. The research results show the possibility of reducing the weight of working equipment by 5 tons and increasing productivity by 6%.
format Article
id doaj-art-4203db54504a4069a3f5d667f450b522
institution DOAJ
issn 1816-4528
2949-0634
language English
publishDate 2024-02-01
publisher T. F. Gorbachev Kuzbass State Technical University
record_format Article
series Горное оборудование и электромеханика
spelling doaj-art-4203db54504a4069a3f5d667f450b5222025-08-20T02:47:58ZengT. F. Gorbachev Kuzbass State Technical UniversityГорное оборудование и электромеханика1816-45282949-06342024-02-011711182310.26730/1816-4528-2024-1-18-23Investigation of the loading of hydraulic excavator working equipmentShestakov V.S.0Teliman I.V.1Bezkorovayny P.G. 2Ural State Mining UniversityNAO Karaganda Technical UniversityUral State Mining University; NAO Karaganda Technical UniversityThe relevance of the work is determined by the need to increase the efficiency of hydraulic excavators, on which the cost of mining significantly depends. The purpose of the work is to improve the working equipment of a hydraulic excavator and develop a methodology for determining rational parameters that ensure a reduction in its weight. A scheme of working equipment is proposed with the exception of hydraulic cylinders for turning the boom in comparison with the traditional scheme and with a pressure mechanism with a pressure rod located on the superstructure on the axis of rotation. This scheme makes it possible to increase the capacity of the bucket and thereby the productivity of the excavator. A method for determining the design parameters of an excavator is presented, which ensures that the sections of the boom and arm are determined without “excessive” safety margins and thereby obtaining a minimum mass. At the same time, if you leave the tipping moment the same as that of the base model, then it will be possible to increase the capacity of the bucket and the productivity of the excavator. The EG-110 hydraulic excavator was taken as the base object used for comparison with the proposed design. The research results show the possibility of reducing the weight of working equipment by 5 tons and increasing productivity by 6%.https://gormash.kuzstu.ru/index.php?page=article&id=4368hydraulic excavatorboomhandlebucketpressure rodhydraulic cylinderforce
spellingShingle Shestakov V.S.
Teliman I.V.
Bezkorovayny P.G.
Investigation of the loading of hydraulic excavator working equipment
Горное оборудование и электромеханика
hydraulic excavator
boom
handle
bucket
pressure rod
hydraulic cylinder
force
title Investigation of the loading of hydraulic excavator working equipment
title_full Investigation of the loading of hydraulic excavator working equipment
title_fullStr Investigation of the loading of hydraulic excavator working equipment
title_full_unstemmed Investigation of the loading of hydraulic excavator working equipment
title_short Investigation of the loading of hydraulic excavator working equipment
title_sort investigation of the loading of hydraulic excavator working equipment
topic hydraulic excavator
boom
handle
bucket
pressure rod
hydraulic cylinder
force
url https://gormash.kuzstu.ru/index.php?page=article&id=4368
work_keys_str_mv AT shestakovvs investigationoftheloadingofhydraulicexcavatorworkingequipment
AT telimaniv investigationoftheloadingofhydraulicexcavatorworkingequipment
AT bezkorovaynypg investigationoftheloadingofhydraulicexcavatorworkingequipment