Design and Application of Full-Time Dimension Dispatching Schedule Safety Check

With the increasing of power grid scale and advancement of power market, the safety and reliability of power grid operations are facing increasing challenges, and the safety check of power generation schedules becomes particularly important. Under large time-scale, it is almost impossible to accurat...

Full description

Saved in:
Bibliographic Details
Main Authors: Di WU, Zhengfeng WANG, Hang LIU
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2020-05-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201908143
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850227426757443584
author Di WU
Zhengfeng WANG
Hang LIU
author_facet Di WU
Zhengfeng WANG
Hang LIU
author_sort Di WU
collection DOAJ
description With the increasing of power grid scale and advancement of power market, the safety and reliability of power grid operations are facing increasing challenges, and the safety check of power generation schedules becomes particularly important. Under large time-scale, it is almost impossible to accurately predict the load and grid structure, so it is difficult to conduct safety check accurately. To solve this problem, this paper designs and develops a safety check system of full-time dimension dispatching schedule. It firstly discusses the monthly, weekly and day-ahead safety check functions according to the power dispatching process, and then proposes the full-time (monthly, weekly and day-ahead) dimension safety check goals. The monthly target is based on the completion of power generation plan and the coordinated optimization of power generation and transmission. The weekly target is based on the optimization of generator start-up mode. The day-ahead target is based on the power generation schedule. For the monthly safety check, a power generation feasible domain is constructed based on the power flow section, and the generation feasible range is optimized to compensate for the error of monthly load forecast. For the weekly safety check, the generator start-up mode is determined through optimization. For the day-ahead safety check, the output of generator unit is optimized. The system has been successfully applied in Anhui Power Grid, and the application results show that the proposed method is effective and can meet the needs of power grid safety check.
format Article
id doaj-art-412098b0247d46f7b4f78333d625fabb
institution OA Journals
issn 1004-9649
language zho
publishDate 2020-05-01
publisher State Grid Energy Research Institute
record_format Article
series Zhongguo dianli
spelling doaj-art-412098b0247d46f7b4f78333d625fabb2025-08-20T02:04:51ZzhoState Grid Energy Research InstituteZhongguo dianli1004-96492020-05-01535485510.11930/j.issn.1004-9649.201908143zgdl-53-4-wudiDesign and Application of Full-Time Dimension Dispatching Schedule Safety CheckDi WU0Zhengfeng WANG1Hang LIU2State Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaState Grid Anhui Electric Power Co., Ltd., Hefei 230022, ChinaWith the increasing of power grid scale and advancement of power market, the safety and reliability of power grid operations are facing increasing challenges, and the safety check of power generation schedules becomes particularly important. Under large time-scale, it is almost impossible to accurately predict the load and grid structure, so it is difficult to conduct safety check accurately. To solve this problem, this paper designs and develops a safety check system of full-time dimension dispatching schedule. It firstly discusses the monthly, weekly and day-ahead safety check functions according to the power dispatching process, and then proposes the full-time (monthly, weekly and day-ahead) dimension safety check goals. The monthly target is based on the completion of power generation plan and the coordinated optimization of power generation and transmission. The weekly target is based on the optimization of generator start-up mode. The day-ahead target is based on the power generation schedule. For the monthly safety check, a power generation feasible domain is constructed based on the power flow section, and the generation feasible range is optimized to compensate for the error of monthly load forecast. For the weekly safety check, the generator start-up mode is determined through optimization. For the day-ahead safety check, the output of generator unit is optimized. The system has been successfully applied in Anhui Power Grid, and the application results show that the proposed method is effective and can meet the needs of power grid safety check.https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201908143safety checkgeneration feasible domainblocking sectionsensitivity
spellingShingle Di WU
Zhengfeng WANG
Hang LIU
Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
Zhongguo dianli
safety check
generation feasible domain
blocking section
sensitivity
title Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
title_full Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
title_fullStr Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
title_full_unstemmed Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
title_short Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
title_sort design and application of full time dimension dispatching schedule safety check
topic safety check
generation feasible domain
blocking section
sensitivity
url https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201908143
work_keys_str_mv AT diwu designandapplicationoffulltimedimensiondispatchingschedulesafetycheck
AT zhengfengwang designandapplicationoffulltimedimensiondispatchingschedulesafetycheck
AT hangliu designandapplicationoffulltimedimensiondispatchingschedulesafetycheck