Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type
THE PURPOSE. To determine the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations, consider an improved technology for installing a "pillow" under the foundation of a kiosk-type 10 / 0.4 kV transformer substation and determine the time spent on its ins...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Kazan State Power Engineering University
2021-07-01
|
| Series: | Известия высших учебных заведений: Проблемы энергетики |
| Subjects: | |
| Online Access: | https://www.energyret.ru/jour/article/view/1851 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1850147801537708032 |
|---|---|
| author | M. V. Borodin S. Yu. Zakharov R. P. Belikov V. I. Bobrovsky |
| author_facet | M. V. Borodin S. Yu. Zakharov R. P. Belikov V. I. Bobrovsky |
| author_sort | M. V. Borodin |
| collection | DOAJ |
| description | THE PURPOSE. To determine the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations, consider an improved technology for installing a "pillow" under the foundation of a kiosk-type 10 / 0.4 kV transformer substation and determine the time spent on its installation. METHODS. The article presents an analysis of data on the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations, an algorithm for installing an improved "pillow" under the foundation of a 10 / 0.4 kV kiosk-type transformer substation. RESULTS. In the course of the experiment on the installation of an improved "pillow" under the foundation of the CTS, the time of work was determined. The total time spent on the construction of an improved "pillow" under the foundation of a kiosk-type CTS was 580 minutes, which is just over 9.5 hours. Also the standardized time of work during the installation of an improved "pillow" under the foundation of a kiosk-type CTS Also, the standardized time for performing work during the installation of an improved "pillow" under the foundation of a kiosk- type package transformer substation has been proposed. CONCLUSIONS. The use of the data presented in the article on the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations will allow scientists and specialists to develop and propose new methods of reconstruction and construction technologies for various transformer substations, as well as determine the economic efficiency of new foundations for transformer substations. The technology of kiosk-type CTS foundation installation described in the article will allow not only to increase the operational characteristics of the CTS, but also ensure the fire safety of the installed equipment. The technical solution specified in the article can be used during the reconstruction and construction of a 10 / 0.4 kV kiosk-type package transformer substation. The proposed algorithm for mounting an improved "pillow" under the foundation of a kiosk-type package transformer substation is universal, since it can be used at a package transformer substation of various capacities. |
| format | Article |
| id | doaj-art-4010e6d9121f4e95b78fc722affeaeba |
| institution | OA Journals |
| issn | 1998-9903 |
| language | English |
| publishDate | 2021-07-01 |
| publisher | Kazan State Power Engineering University |
| record_format | Article |
| series | Известия высших учебных заведений: Проблемы энергетики |
| spelling | doaj-art-4010e6d9121f4e95b78fc722affeaeba2025-08-20T02:27:27ZengKazan State Power Engineering UniversityИзвестия высших учебных заведений: Проблемы энергетики1998-99032021-07-0123315416710.30724/1998-9903-2021-23-3-154-167768Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk typeM. V. Borodin0S. Yu. Zakharov1R. P. Belikov2V. I. Bobrovsky3Oryol State Agrarian University named after N.V. ParakhinaBranch of IDGC of Center and Volga Region, IRGC - TulenergoOryol State Agrarian University named after N.V. ParakhinaBranch of IDGC of Center, IRGC - OrelenergoTHE PURPOSE. To determine the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations, consider an improved technology for installing a "pillow" under the foundation of a kiosk-type 10 / 0.4 kV transformer substation and determine the time spent on its installation. METHODS. The article presents an analysis of data on the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations, an algorithm for installing an improved "pillow" under the foundation of a 10 / 0.4 kV kiosk-type transformer substation. RESULTS. In the course of the experiment on the installation of an improved "pillow" under the foundation of the CTS, the time of work was determined. The total time spent on the construction of an improved "pillow" under the foundation of a kiosk-type CTS was 580 minutes, which is just over 9.5 hours. Also the standardized time of work during the installation of an improved "pillow" under the foundation of a kiosk-type CTS Also, the standardized time for performing work during the installation of an improved "pillow" under the foundation of a kiosk- type package transformer substation has been proposed. CONCLUSIONS. The use of the data presented in the article on the number of reconstructed, newly installed and replaced 10 / 0.4 kV transformer substations will allow scientists and specialists to develop and propose new methods of reconstruction and construction technologies for various transformer substations, as well as determine the economic efficiency of new foundations for transformer substations. The technology of kiosk-type CTS foundation installation described in the article will allow not only to increase the operational characteristics of the CTS, but also ensure the fire safety of the installed equipment. The technical solution specified in the article can be used during the reconstruction and construction of a 10 / 0.4 kV kiosk-type package transformer substation. The proposed algorithm for mounting an improved "pillow" under the foundation of a kiosk-type package transformer substation is universal, since it can be used at a package transformer substation of various capacities.https://www.energyret.ru/jour/article/view/1851transformer substationfoundationtechnologysafetyreliability |
| spellingShingle | M. V. Borodin S. Yu. Zakharov R. P. Belikov V. I. Bobrovsky Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type Известия высших учебных заведений: Проблемы энергетики transformer substation foundation technology safety reliability |
| title | Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type |
| title_full | Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type |
| title_fullStr | Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type |
| title_full_unstemmed | Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type |
| title_short | Improvement of the technology of installation of «pillows» under the foundation of CTS 10 / 0.4 kV kiosk type |
| title_sort | improvement of the technology of installation of pillows under the foundation of cts 10 0 4 kv kiosk type |
| topic | transformer substation foundation technology safety reliability |
| url | https://www.energyret.ru/jour/article/view/1851 |
| work_keys_str_mv | AT mvborodin improvementofthetechnologyofinstallationofpillowsunderthefoundationofcts1004kvkiosktype AT syuzakharov improvementofthetechnologyofinstallationofpillowsunderthefoundationofcts1004kvkiosktype AT rpbelikov improvementofthetechnologyofinstallationofpillowsunderthefoundationofcts1004kvkiosktype AT vibobrovsky improvementofthetechnologyofinstallationofpillowsunderthefoundationofcts1004kvkiosktype |