Study on the Application of Gob-Side Entry Retaining via Roof Cutting under the Condition of a Hard Thick Roof
To solve the problem of instability and failure of a roadway in the Dianping coal mine working face under the condition of traditional gob-side entry retaining, a mechanical model was established for analysis. The reasons for the damage are as follows: (1) the mining height is high, and the hard thi...
Saved in:
| Main Authors: | Daoyong Zhu, Huyue Zhang, Yi Su |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Geofluids |
| Online Access: | http://dx.doi.org/10.1155/2022/4773250 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of the effect of cutting depth under thick immediate roof on gob-side entry retaining stability
by: WANG Fei, et al.
Published: (2024-12-01) -
Study of Gob-Side Entry Retaining Technology with Roof Cutting under Upper Roadway Condition
by: Xingen Ma, et al.
Published: (2021-01-01) -
Analysis of Roof Deformation Mechanism and Control Measures with Roof Cutting and Pressure Releasing in Gob-Side Entry Retaining
by: Bing-Jun Sun, et al.
Published: (2021-01-01) -
Stress Evolution Law of Surrounding Rock with Gob-Side Entry Retaining by Roof Cutting and Pressure Release in Composite Roof
by: Yong Zhang, et al.
Published: (2020-01-01) -
Numerical Investigation of Gob-Side Entry Retaining through Precut Overhanging Hard Roof to Control Rockburst
by: Xiaoming Sun, et al.
Published: (2018-01-01)