Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis
[Objective] The high reliability of urban rail transit system equipment is the cornerstone and guarantee for maintaining the safe and stable operation. Due to the rapid increase in operating mileage and the continuous expansion of network line capacity in recent years, the operational risks of urban...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-04-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.012.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1850144696178835456 |
|---|---|
| author | WANG Junzhe ZHU Lin LIU Zhigang TAO Yijun HUANG Yuanchun |
| author_facet | WANG Junzhe ZHU Lin LIU Zhigang TAO Yijun HUANG Yuanchun |
| author_sort | WANG Junzhe |
| collection | DOAJ |
| description | [Objective] The high reliability of urban rail transit system equipment is the cornerstone and guarantee for maintaining the safe and stable operation. Due to the rapid increase in operating mileage and the continuous expansion of network line capacity in recent years, the operational risks of urban rail transit are increasing every day, and the impact of reliability on safety risks is receiving increasing attention from the industry. [Method] Based on the impact of lifecycle events on reliability, urban rail transit equipment is divided into lifecycle stages (operation and maintenance phase). According to historical failure data, a data statistical model assisted by a mechanism model is established, and relevant reliability indicators are characterized through Minitab software. Based on the risk matrix method, the mapping relationship between reliability and lifecycle stages is characterized, and an equipment risk assessment model considering lifecycle stages is established. [Result & Conclusion] Taking the vehicle bogie wheelset axle box assembly as a case study, according to the vehicle specialized maintenance content and cycle requirements, the daily operation stages are categorized into four periods: stable operation, early failure, late failure, and replacement; the failure interval time is tested for fitting, and the three-parameter Weibull distribution is selected to represent its reliability characteristic function; each phase is mapped and assigned values through the reliability characteristic function. Based on the risk matrix method, the risk assessment levels of the vehicle bogie wheelset axle box assembly at each stage are obtained, and then the risk assessment results for each stage are output respectively. Risk levels for each stage are marked as R5, R3, R1, and R1. |
| format | Article |
| id | doaj-art-3de1bbed2df24381b72f3d2124e79fb4 |
| institution | OA Journals |
| issn | 1007-869X |
| language | zho |
| publishDate | 2025-04-01 |
| publisher | Urban Mass Transit Magazine Press |
| record_format | Article |
| series | Chengshi guidao jiaotong yanjiu |
| spelling | doaj-art-3de1bbed2df24381b72f3d2124e79fb42025-08-20T02:28:18ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-04-01284606610.16037/j.1007-869x.2025.04.012Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability AnalysisWANG Junzhe0ZHU Lin1LIU Zhigang2TAO Yijun3HUANG Yuanchun4China Railway Oil Group Co., Ltd., 100073, Beijing, ChinaSchool of Urban Railway Transportation, Shanghai University of Engineering Science, 201620, Shanghai, ChinaSchool of Urban Railway Transportation, Shanghai University of Engineering Science, 201620, Shanghai, ChinaShanghai Rail Transit Maintenance Support Co., Ltd., 200030, Shanghai, ChinaSchool of Urban Railway Transportation, Shanghai University of Engineering Science, 201620, Shanghai, China[Objective] The high reliability of urban rail transit system equipment is the cornerstone and guarantee for maintaining the safe and stable operation. Due to the rapid increase in operating mileage and the continuous expansion of network line capacity in recent years, the operational risks of urban rail transit are increasing every day, and the impact of reliability on safety risks is receiving increasing attention from the industry. [Method] Based on the impact of lifecycle events on reliability, urban rail transit equipment is divided into lifecycle stages (operation and maintenance phase). According to historical failure data, a data statistical model assisted by a mechanism model is established, and relevant reliability indicators are characterized through Minitab software. Based on the risk matrix method, the mapping relationship between reliability and lifecycle stages is characterized, and an equipment risk assessment model considering lifecycle stages is established. [Result & Conclusion] Taking the vehicle bogie wheelset axle box assembly as a case study, according to the vehicle specialized maintenance content and cycle requirements, the daily operation stages are categorized into four periods: stable operation, early failure, late failure, and replacement; the failure interval time is tested for fitting, and the three-parameter Weibull distribution is selected to represent its reliability characteristic function; each phase is mapped and assigned values through the reliability characteristic function. Based on the risk matrix method, the risk assessment levels of the vehicle bogie wheelset axle box assembly at each stage are obtained, and then the risk assessment results for each stage are output respectively. Risk levels for each stage are marked as R5, R3, R1, and R1.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.012.htmlurban rail transitentire lifecyclereliabilityrisk assessment |
| spellingShingle | WANG Junzhe ZHU Lin LIU Zhigang TAO Yijun HUANG Yuanchun Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis Chengshi guidao jiaotong yanjiu urban rail transit entire lifecycle reliability risk assessment |
| title | Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis |
| title_full | Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis |
| title_fullStr | Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis |
| title_full_unstemmed | Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis |
| title_short | Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis |
| title_sort | life cycle risk assessment of urban rail equipment based on reliability analysis |
| topic | urban rail transit entire lifecycle reliability risk assessment |
| url | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.012.html |
| work_keys_str_mv | AT wangjunzhe lifecycleriskassessmentofurbanrailequipmentbasedonreliabilityanalysis AT zhulin lifecycleriskassessmentofurbanrailequipmentbasedonreliabilityanalysis AT liuzhigang lifecycleriskassessmentofurbanrailequipmentbasedonreliabilityanalysis AT taoyijun lifecycleriskassessmentofurbanrailequipmentbasedonreliabilityanalysis AT huangyuanchun lifecycleriskassessmentofurbanrailequipmentbasedonreliabilityanalysis |