Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station
The design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges. The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads. In this paper, a case study of the Zhongjie subway...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2014-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2014/275362 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832548729636257792 |
---|---|
author | Yong-ping Guan Wen Zhao Shen-gang Li Guo-bin Zhang |
author_facet | Yong-ping Guan Wen Zhao Shen-gang Li Guo-bin Zhang |
author_sort | Yong-ping Guan |
collection | DOAJ |
description | The design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges. The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads. In this paper, a case study of the Zhongjie subway station located in Shenyang, China, is examined to investigate the key construction techniques and the influence of the Pile-Beam-Arch (PBA) excavation method on the surrounding environment. This case study discusses the primary risk factors affecting the environmental safety and summarizes the corresponding risk mitigation measures and key techniques for subway station construction using the PBA excavation method in a densely populated urban area. |
format | Article |
id | doaj-art-3d0d8bac404c446b8e005501b17c0aed |
institution | Kabale University |
issn | 2356-6140 1537-744X |
language | English |
publishDate | 2014-01-01 |
publisher | Wiley |
record_format | Article |
series | The Scientific World Journal |
spelling | doaj-art-3d0d8bac404c446b8e005501b17c0aed2025-02-03T06:13:12ZengWileyThe Scientific World Journal2356-61401537-744X2014-01-01201410.1155/2014/275362275362Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway StationYong-ping Guan0Wen Zhao1Shen-gang Li2Guo-bin Zhang3School of Resources and Civil Engineering, Northeastern University, Shenyang 110819, ChinaSchool of Resources and Civil Engineering, Northeastern University, Shenyang 110819, ChinaSchool of Resources and Civil Engineering, Northeastern University, Shenyang 110819, ChinaShenyang Design and Research Institute of Municipal Engineering, Shenyang 110015, ChinaThe design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges. The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads. In this paper, a case study of the Zhongjie subway station located in Shenyang, China, is examined to investigate the key construction techniques and the influence of the Pile-Beam-Arch (PBA) excavation method on the surrounding environment. This case study discusses the primary risk factors affecting the environmental safety and summarizes the corresponding risk mitigation measures and key techniques for subway station construction using the PBA excavation method in a densely populated urban area.http://dx.doi.org/10.1155/2014/275362 |
spellingShingle | Yong-ping Guan Wen Zhao Shen-gang Li Guo-bin Zhang Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station The Scientific World Journal |
title | Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station |
title_full | Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station |
title_fullStr | Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station |
title_full_unstemmed | Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station |
title_short | Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station |
title_sort | key techniques and risk management for the application of the pile beam arch pba excavation method a case study of the zhongjie subway station |
url | http://dx.doi.org/10.1155/2014/275362 |
work_keys_str_mv | AT yongpingguan keytechniquesandriskmanagementfortheapplicationofthepilebeamarchpbaexcavationmethodacasestudyofthezhongjiesubwaystation AT wenzhao keytechniquesandriskmanagementfortheapplicationofthepilebeamarchpbaexcavationmethodacasestudyofthezhongjiesubwaystation AT shengangli keytechniquesandriskmanagementfortheapplicationofthepilebeamarchpbaexcavationmethodacasestudyofthezhongjiesubwaystation AT guobinzhang keytechniquesandriskmanagementfortheapplicationofthepilebeamarchpbaexcavationmethodacasestudyofthezhongjiesubwaystation |