Reliability Analysis and Improvement of Smart Electric Energy Meter Considering Field Verification
In order to solve the problem of 8-year expiration replacement of smart electric energy meters, three schemes for electric energy meter replacement are introduced and analyzed. The improvement of the production level of smart energy meters has provided a necessary basis for extending the replacement...
Saved in:
| Main Authors: | Jinjun XIE, Wenbin ZHOU, Shifeng LIU, Zijuan JIANG, Yang JIN, Lei ZHAO |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
State Grid Energy Research Institute
2019-10-01
|
| Series: | Zhongguo dianli |
| Subjects: | |
| Online Access: | https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201812099 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An anomaly identifying method for metering of standard electricity meters in an automatic verification assembly line based on correlated time-invariant
by: XING Yu, et al.
Published: (2025-02-01) -
Optimization of Technologies for Implementing Smart Metering in Residential Electricity Supplies in Peru
by: Alfredo Abarca, et al.
Published: (2025-04-01) -
A lattice-based anti-quantum privacy-preserving scheme for smart meter
by: Shaomin Zhang, et al.
Published: (2025-05-01) -
Quantum-Resistant Cryptography for Smart Metering in Smart Grid Systems
by: Janusz Jabłoński, et al.
Published: (2025-02-01) -
Cybersecurity and Major Cyber Threats of Smart Meters: A Systematic Mapping Review
by: Jones Márcio Nambundo, et al.
Published: (2025-03-01)