Reliability Analysis and Improvement of Smart Electric Energy Meter Considering Field Verification

In order to solve the problem of 8-year expiration replacement of smart electric energy meters, three schemes for electric energy meter replacement are introduced and analyzed. The improvement of the production level of smart energy meters has provided a necessary basis for extending the replacement...

Full description

Saved in:
Bibliographic Details
Main Authors: Jinjun XIE, Wenbin ZHOU, Shifeng LIU, Zijuan JIANG, Yang JIN, Lei ZHAO
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2019-10-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.201812099
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In order to solve the problem of 8-year expiration replacement of smart electric energy meters, three schemes for electric energy meter replacement are introduced and analyzed. The improvement of the production level of smart energy meters has provided a necessary basis for extending the replacement period of electric energy meters. In view of the scheme of extending the replacement period with field verification method, a correction is made of the operation life process of the electric energy meter based on Weibull distribution analysis considering the climatic factors of different regions and the influence of the field verification result of the electric energy meters. The theoretical analysis and actual application have proved the feasibility of the proposed method, which will provide a reference for extending the replacement period of the smart electric meters.
ISSN:1004-9649