Minimization of unevenness of the loading of the selfcompensating high voltage power lines

For minimization of unevenness of the loading the chains operated selfcompensating high-voltage power lines (OSHPL) in process of management of its reception capacity by means of synchronous change the angular shift of the phases of the voltage vector systems of the chains on its both sides is offer...

Full description

Saved in:
Bibliographic Details
Main Authors: Suslov V.M, Postolati V.M.
Format: Article
Language:English
Published: Academy of Sciences of Moldova 2007-12-01
Series:Problems of the Regional Energetics
Subjects:
Online Access:http://journal.ie.asm.md/assets/files/m71_2_56.doc
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:For minimization of unevenness of the loading the chains operated selfcompensating high-voltage power lines (OSHPL) in process of management of its reception capacity by means of synchronous change the angular shift of the phases of the voltage vector systems of the chains on its both sides is offered hereto process to add the additional regulation on sending end of the line. The Analytical way is determined criterion this additional regulation. In addition notion of the quasiwave mode OSHPL is determined for free angle of the shift of the phases of the voltage vector systems of its chains.Key word: power line, angular shift of the phases.
ISSN:1857-0070