Scheme of Left Dam Abutment Pre - stressed Anchor Cable Construction in Jinyuan Electricity Plant
Saved in:
Main Author: | XU Xiu-mei |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2010-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47661204&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station
by: LIU Hong-bao, et al.
Published: (2005-01-01) -
Analysis of Stability of Abutment in Arch Dam of Jintan Hydropower Station
by: CHEN Liang
Published: (2009-01-01) -
Corrosion Characteristics of Anchor Cables in Electrolytic Corrosion Test and the Applicability of the Test Method in Study of Anchor Cable Corrosion
by: Tao Yin, et al.
Published: (2021-01-01) -
Seismic Response of Rock Slopes with the Anchor Cable in Centrifuge Modeling Tests
by: Yong Nie, et al.
Published: (2020-01-01) -
Application of Prestressed Anchor Cable in the Reinforcement of Outlet Slope of Shawan Tunnel
by: 叶宝民, et al.
Published: (2003-01-01)