Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs

Asynchronous injection–production cycle (AIPC) in a horizontal–vertical well pattern is an efficient strategy for enhancing water injection in tight reservoirs. However, current studies lack consideration of waterflood-induced fractures (WIFs) caused by long-term water injection. This paper takes bl...

Full description

Saved in:
Bibliographic Details
Main Authors: Jianwen Chen, Dingning Cai, Tao Zhang, Linjun Yu, Dalin Zhou, Shiqing Cheng
Format: Article
Language:English
Published: MDPI AG 2024-09-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/17/19/4838
Tags: Add Tag
No Tags, Be the first to tag this record!