Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder

The dike reinforcement project in a polder has a total length of 8 873 m.There are some local problems along the dikes,such as the insufficient crest elevation,thin dikes,insufficient stability of dike slopes,leakage of dikes,and damaged pavement on the crest,which affect the flood control safety of...

Full description

Saved in:
Bibliographic Details
Main Authors: WU Juan, ZHANG Ming, LI Yansong
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2022-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.03.017
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535764484063232
author WU Juan
ZHANG Ming
LI Yansong
author_facet WU Juan
ZHANG Ming
LI Yansong
author_sort WU Juan
collection DOAJ
description The dike reinforcement project in a polder has a total length of 8 873 m.There are some local problems along the dikes,such as the insufficient crest elevation,thin dikes,insufficient stability of dike slopes,leakage of dikes,and damaged pavement on the crest,which affect the flood control safety of dikes and cannot meet the normal operation requirements.Therefore,on the basis of analyzing the present situation and problems,targeted research on dike reinforcement design is carried out,and the design principles of dike reinforcement are put forward.Moreover,we implement the design contents,including the recheck of crest elevation,reinforcement design of dike sections,anti-sliding stability recheck of dike slopes,anti-seepage and reinforcement design of dikes,and effect evaluation.The reinforcement design scheme fully considers the actual local situation,which meets the overall flood control requirements of the river basin and is compatible with the local existing flood control projects for operation.The proposed dike reinforcement design scheme has certain universality and can be used as a reference for dike reinforcement in plain areas.
format Article
id doaj-art-38eae04e0db94f5db58a6f7651140d43
institution Kabale University
issn 1001-9235
language zho
publishDate 2022-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-38eae04e0db94f5db58a6f7651140d432025-01-15T02:27:37ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352022-01-014347645417Analysis and Recheck of Reinforcement Scheme of Dikes in a PolderWU JuanZHANG MingLI YansongThe dike reinforcement project in a polder has a total length of 8 873 m.There are some local problems along the dikes,such as the insufficient crest elevation,thin dikes,insufficient stability of dike slopes,leakage of dikes,and damaged pavement on the crest,which affect the flood control safety of dikes and cannot meet the normal operation requirements.Therefore,on the basis of analyzing the present situation and problems,targeted research on dike reinforcement design is carried out,and the design principles of dike reinforcement are put forward.Moreover,we implement the design contents,including the recheck of crest elevation,reinforcement design of dike sections,anti-sliding stability recheck of dike slopes,anti-seepage and reinforcement design of dikes,and effect evaluation.The reinforcement design scheme fully considers the actual local situation,which meets the overall flood control requirements of the river basin and is compatible with the local existing flood control projects for operation.The proposed dike reinforcement design scheme has certain universality and can be used as a reference for dike reinforcement in plain areas.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.03.017dikerecheck of crest elevationreinforcement schemestabilityseepage prevention measures
spellingShingle WU Juan
ZHANG Ming
LI Yansong
Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder
Renmin Zhujiang
dike
recheck of crest elevation
reinforcement scheme
stability
seepage prevention measures
title Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder
title_full Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder
title_fullStr Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder
title_full_unstemmed Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder
title_short Analysis and Recheck of Reinforcement Scheme of Dikes in a Polder
title_sort analysis and recheck of reinforcement scheme of dikes in a polder
topic dike
recheck of crest elevation
reinforcement scheme
stability
seepage prevention measures
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.03.017
work_keys_str_mv AT wujuan analysisandrecheckofreinforcementschemeofdikesinapolder
AT zhangming analysisandrecheckofreinforcementschemeofdikesinapolder
AT liyansong analysisandrecheckofreinforcementschemeofdikesinapolder