Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)

The purpose of this research is to identify and rank the causes of delays in construction projects in Iran and on a case-by-case basis in the city of Shiraz. The financial problems of the employer have the greatest impact on the occurrence of delays and financial problems of the contractor, problems...

Full description

Saved in:
Bibliographic Details
Main Authors: Arsalan Bababyi Ardkapan, Ali Aram
Format: Article
Language:fas
Published: Assist. Prof. Dr. Roohollah Taherkhani 2023-08-01
Series:مهندسی و مدیریت ساخت
Subjects:
Online Access:https://www.jecm.ir/article_206175_0f02082eb8099a5b831823b209a046f5.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850117317070946304
author Arsalan Bababyi Ardkapan
Ali Aram
author_facet Arsalan Bababyi Ardkapan
Ali Aram
author_sort Arsalan Bababyi Ardkapan
collection DOAJ
description The purpose of this research is to identify and rank the causes of delays in construction projects in Iran and on a case-by-case basis in the city of Shiraz. The financial problems of the employer have the greatest impact on the occurrence of delays and financial problems of the contractor, problems in obtaining permits, order of changes by the employer, changes and errors in the design, weak management of the contractor and insufficient experience of the contractor are in the next categories. In order to collect data, two library and field methods were used in this research. Collecting primary information through the study of relevant articles and oral surveys of activists and expert experts active in construction projects in the city of Shiraz, a list of the most important factors affecting the occurrence of delays in these projects, including the five main factors, rules and regulations, the employer , consultant, contractor and miscellaneous and uncontrollable cases identified and 85 factors and causes caused by these factors in delaying construction projects were determined and then using a questionnaire and analyzing the resulting data with SPSS software, the factors and factors identified in terms of The impact on the occurrence of delays is rated. The results showed that, respectively, the factors of employer, contractor, consultant, uncontrollable cases and rules and regulations have the most influence on the delay of construction projects in Shiraz city. The sudden increase in prices and the lack of stability in the currency market, materials and wages are the most effective components, and forced accidents and unforeseen conditions such as: floods, earthquakes, and corona are known as the least effective components in causing delays.
format Article
id doaj-art-36d512adbb304350a3e27d5734964dfc
institution OA Journals
issn 2538-1903
2538-2578
language fas
publishDate 2023-08-01
publisher Assist. Prof. Dr. Roohollah Taherkhani
record_format Article
series مهندسی و مدیریت ساخت
spelling doaj-art-36d512adbb304350a3e27d5734964dfc2025-08-20T02:36:07ZfasAssist. Prof. Dr. Roohollah Taherkhaniمهندسی و مدیریت ساخت2538-19032538-25782023-08-01814857206175Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)Arsalan Bababyi Ardkapan0Ali Aram1Department of Civil Engineers, Yasouj, Islamic Azad University, Yasouj, IranDepartment of Civil Engineering, Yasouj Branch, Islamic Azad University, Yasouj, IranThe purpose of this research is to identify and rank the causes of delays in construction projects in Iran and on a case-by-case basis in the city of Shiraz. The financial problems of the employer have the greatest impact on the occurrence of delays and financial problems of the contractor, problems in obtaining permits, order of changes by the employer, changes and errors in the design, weak management of the contractor and insufficient experience of the contractor are in the next categories. In order to collect data, two library and field methods were used in this research. Collecting primary information through the study of relevant articles and oral surveys of activists and expert experts active in construction projects in the city of Shiraz, a list of the most important factors affecting the occurrence of delays in these projects, including the five main factors, rules and regulations, the employer , consultant, contractor and miscellaneous and uncontrollable cases identified and 85 factors and causes caused by these factors in delaying construction projects were determined and then using a questionnaire and analyzing the resulting data with SPSS software, the factors and factors identified in terms of The impact on the occurrence of delays is rated. The results showed that, respectively, the factors of employer, contractor, consultant, uncontrollable cases and rules and regulations have the most influence on the delay of construction projects in Shiraz city. The sudden increase in prices and the lack of stability in the currency market, materials and wages are the most effective components, and forced accidents and unforeseen conditions such as: floods, earthquakes, and corona are known as the least effective components in causing delays.https://www.jecm.ir/article_206175_0f02082eb8099a5b831823b209a046f5.pdfconstruction projectsdelayshirazranking the causes of delay
spellingShingle Arsalan Bababyi Ardkapan
Ali Aram
Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)
مهندسی و مدیریت ساخت
construction projects
delay
shiraz
ranking the causes of delay
title Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)
title_full Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)
title_fullStr Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)
title_full_unstemmed Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)
title_short Identifying and ranking the causes of delays in construction projects in Iran (Case study: construction projects in Shiraz)
title_sort identifying and ranking the causes of delays in construction projects in iran case study construction projects in shiraz
topic construction projects
delay
shiraz
ranking the causes of delay
url https://www.jecm.ir/article_206175_0f02082eb8099a5b831823b209a046f5.pdf
work_keys_str_mv AT arsalanbababyiardkapan identifyingandrankingthecausesofdelaysinconstructionprojectsinirancasestudyconstructionprojectsinshiraz
AT aliaram identifyingandrankingthecausesofdelaysinconstructionprojectsinirancasestudyconstructionprojectsinshiraz