Minimizing the Machine Processing Time in a Flow Shop Scheduling Problem under Piecewise Quadratic Fuzzy Numbers
The piecewise quadratic fuzzy number (PQFN) can signify uncertain information that exists in scientific, technological, and engineering fields. Hence, it is a useful tool for describing information in scheduling problems. This study examines structured n-job flow shop scheduling with fuzzy piecewise...
Saved in:
| Main Authors: | Tingwei Zhou, Hamiden Abd El-Wahed Khalifa, Seyyed Esmaeil Najafi, S.A. Edalatpanah |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Discrete Dynamics in Nature and Society |
| Online Access: | http://dx.doi.org/10.1155/2022/3990534 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A New Methodology for Solving Piecewise Quadratic Fuzzy Cooperative Continuous Static Games
by: He Xiao, et al.
Published: (2022-01-01) -
On a Flow-Shop Scheduling Problem with Fuzzy Pentagonal Processing Time
by: Majed G. Alharbi, et al.
Published: (2021-01-01) -
Developing a new fuzzy approach for solving two-machine flow shop scheduling problems under fuzziness
by: Hamiden Khalifa
Published: (2023-12-01) -
Toward the Nash Equilibrium Solutions for Large-Scale Pentagonal Fuzzy Continuous Static Games
by: Hamiden Abd El-Wahed Khalifa, et al.
Published: (2022-01-01) -
Enhanced Fuzzy Delphi Method in Forecasting and Decision-Making
by: Majed G. Alharbi, et al.
Published: (2021-01-01)