Minimizing the Machine Processing Time in a Flow Shop Scheduling Problem under Piecewise Quadratic Fuzzy Numbers

The piecewise quadratic fuzzy number (PQFN) can signify uncertain information that exists in scientific, technological, and engineering fields. Hence, it is a useful tool for describing information in scheduling problems. This study examines structured n-job flow shop scheduling with fuzzy piecewise...

Full description

Saved in:
Bibliographic Details
Main Authors: Tingwei Zhou, Hamiden Abd El-Wahed Khalifa, Seyyed Esmaeil Najafi, S.A. Edalatpanah
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Discrete Dynamics in Nature and Society
Online Access:http://dx.doi.org/10.1155/2022/3990534
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The piecewise quadratic fuzzy number (PQFN) can signify uncertain information that exists in scientific, technological, and engineering fields. Hence, it is a useful tool for describing information in scheduling problems. This study examines structured n-job flow shop scheduling with fuzzy piecewise quadratic processing times and three machines. Close interval approximation of PQFNs is also offered as one of the most effective approximate intervals. Furthermore, the leasing cost of equipment is minimized with the use of a fuzzy style and an inventive algorithm. To demonstrate how the proposed framework can be used, a numerical illustration is provided.
ISSN:1607-887X