Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
Cracking of newly placed binary Portland cement-slag concrete adjacent to bridge deck expansion dam replacements has been observed on several newly rehabilitated sections of bridge decks. This paper investigates the causes of cracking by assessing the concrete mixtures specified for bridge deck reha...
Saved in:
Main Authors: | Jared R. Wright, Farshad Rajabipour, Jeffrey A. Laman, Aleksandra Radlińska |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2014-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2014/103421 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Impact of Traffic-Induced Bridge Vibration on Rapid Repairing High-Performance Concrete for Bridge Deck Pavement Repairs
by: Wei Wang, et al.
Published: (2014-01-01) -
Effect of cracking and randomness of inputs on corrosion initiation of reinforced concrete bridge decks exposed to chlorides
by: P. Konecny, et al.
Published: (2017-01-01) -
Effect of cracking and randomness of inputs on corrosion initiation of reinforced concrete bridge decks exposed to chlorides
by: P. Konecny, et al.
Published: (2016-12-01) -
Dynamic Property Analysis of Orthotropic Bridge Deck with Local Fatigue Crack
by: Zhao Li, et al.
Published: (2022-01-01) -
Fatigue Performance of Steel-Concrete Composite Continuous Box Girder Bridge Deck
by: Yuanxun Zheng, et al.
Published: (2021-01-01)