Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections

Cracking of newly placed binary Portland cement-slag concrete adjacent to bridge deck expansion dam replacements has been observed on several newly rehabilitated sections of bridge decks. This paper investigates the causes of cracking by assessing the concrete mixtures specified for bridge deck reha...

Full description

Saved in:
Bibliographic Details
Main Authors: Jared R. Wright, Farshad Rajabipour, Jeffrey A. Laman, Aleksandra Radlińska
Format: Article
Language:English
Published: Wiley 2014-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2014/103421
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832559268049453056
author Jared R. Wright
Farshad Rajabipour
Jeffrey A. Laman
Aleksandra Radlińska
author_facet Jared R. Wright
Farshad Rajabipour
Jeffrey A. Laman
Aleksandra Radlińska
author_sort Jared R. Wright
collection DOAJ
description Cracking of newly placed binary Portland cement-slag concrete adjacent to bridge deck expansion dam replacements has been observed on several newly rehabilitated sections of bridge decks. This paper investigates the causes of cracking by assessing the concrete mixtures specified for bridge deck rehabilitation projects, as well as reviewing the structural design of decks and the construction and curing methods implemented by the contractors. The work consists of (1) a comprehensive literature review of the causes of cracking on bridge decks, (2) a review of previous bridge deck rehabilitation projects that experienced early-age cracking along with construction observations of active deck rehabilitation projects, and (3) an experimental evaluation of the two most commonly used bridge deck concrete mixtures. Based on the literature review, the causes of concrete bridge deck cracking can be classified into three categories: concrete material properties, construction practices, and structural design factors. The most likely causes of the observed early-age cracking were found to be inadequate curing and failure to properly eliminate the risk of plastic shrinkage cracking. These results underscore the significance of proper moist curing methods for concrete bridge decks, including repair sections. This document also provides a blueprint for future researchers to investigate early-age cracking of concrete structures.
format Article
id doaj-art-35ce30c3a4e543a7b13b925a27d2987a
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2014-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-35ce30c3a4e543a7b13b925a27d2987a2025-02-03T01:30:27ZengWileyAdvances in Civil Engineering1687-80861687-80942014-01-01201410.1155/2014/103421103421Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair SectionsJared R. Wright0Farshad Rajabipour1Jeffrey A. Laman2Aleksandra Radlińska3Department of Civil and Environmental Engineering, The Pennsylvania State University, 3127 Research Drive, State College, PA 16801, USADepartment of Civil and Environmental Engineering, The Pennsylvania State University, 231M Sackett Building, University Park, PA 16802, USADepartment of Civil and Environmental Engineering, The Pennsylvania State University, 231J Sackett Building, University Park, PA 16802, USADepartment of Civil and Environmental Engineering, The Pennsylvania State University, 231D Sackett Building, University Park, PA 16802, USACracking of newly placed binary Portland cement-slag concrete adjacent to bridge deck expansion dam replacements has been observed on several newly rehabilitated sections of bridge decks. This paper investigates the causes of cracking by assessing the concrete mixtures specified for bridge deck rehabilitation projects, as well as reviewing the structural design of decks and the construction and curing methods implemented by the contractors. The work consists of (1) a comprehensive literature review of the causes of cracking on bridge decks, (2) a review of previous bridge deck rehabilitation projects that experienced early-age cracking along with construction observations of active deck rehabilitation projects, and (3) an experimental evaluation of the two most commonly used bridge deck concrete mixtures. Based on the literature review, the causes of concrete bridge deck cracking can be classified into three categories: concrete material properties, construction practices, and structural design factors. The most likely causes of the observed early-age cracking were found to be inadequate curing and failure to properly eliminate the risk of plastic shrinkage cracking. These results underscore the significance of proper moist curing methods for concrete bridge decks, including repair sections. This document also provides a blueprint for future researchers to investigate early-age cracking of concrete structures.http://dx.doi.org/10.1155/2014/103421
spellingShingle Jared R. Wright
Farshad Rajabipour
Jeffrey A. Laman
Aleksandra Radlińska
Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
Advances in Civil Engineering
title Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
title_full Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
title_fullStr Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
title_full_unstemmed Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
title_short Causes of Early Age Cracking on Concrete Bridge Deck Expansion Joint Repair Sections
title_sort causes of early age cracking on concrete bridge deck expansion joint repair sections
url http://dx.doi.org/10.1155/2014/103421
work_keys_str_mv AT jaredrwright causesofearlyagecrackingonconcretebridgedeckexpansionjointrepairsections
AT farshadrajabipour causesofearlyagecrackingonconcretebridgedeckexpansionjointrepairsections
AT jeffreyalaman causesofearlyagecrackingonconcretebridgedeckexpansionjointrepairsections
AT aleksandraradlinska causesofearlyagecrackingonconcretebridgedeckexpansionjointrepairsections