Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
Electrical energy supply which is not evenly distributed throughout the territory of Indonesia is mainly due to the width of the area the limitation on the budget. This condition has enforcing the rural residents to make their own electric energy generation. The discovery of a compact electric gener...
Saved in:
Main Author: | N Nusyirwan |
---|---|
Format: | Article |
Language: | English |
Published: |
Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas
2017-08-01
|
Series: | Metal: Jurnal Sistem Mekanik dan Termal |
Online Access: | https://metal.ft.unand.ac.id/index.php/metal/article/view/7 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
EVALUASI PELAYANAN ANGKUTAN PEDESAAN
by: Tonny Judiantono
Published: (2021-10-01) -
RANCANG BANGUN MODEL PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) MENGGUNAKAN PADDLE BREAST WHEEL
by: Ichlas Nur, et al.
Published: (2024-12-01) -
Tinjauan Implementasi Kebijakan Listrik Pedesaan di Desa Semembang dan Desa Sanglar, Kecamatan Durai Karimun
by: Doni Septian Septian, et al.
Published: (2024-11-01) -
Perancangan User Experience Aplikasi Penghemat Listrik myECO dengan Otomatisasi dan Manajemen Listrik untuk Rumah Tangga
by: Maulana Derifato Achmad, et al.
Published: (2024-12-01) -
The Perancangan Simulator Sinkronisasi Generator ke Jaringan Listrik Menggunakan Game Engine Unity
by: Benhur Nainggolan, et al.
Published: (2024-08-01)