Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan

Electrical energy supply which is not evenly distributed throughout the territory of Indonesia is mainly due to the width of the area the limitation on the budget. This condition has enforcing the rural residents to make their own electric energy generation. The discovery of a compact electric gener...

Full description

Saved in:
Bibliographic Details
Main Author: N Nusyirwan
Format: Article
Language:English
Published: Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas 2017-08-01
Series:Metal: Jurnal Sistem Mekanik dan Termal
Online Access:https://metal.ft.unand.ac.id/index.php/metal/article/view/7
Tags: Add Tag
No Tags, Be the first to tag this record!