Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan

Electrical energy supply which is not evenly distributed throughout the territory of Indonesia is mainly due to the width of the area the limitation on the budget. This condition has enforcing the rural residents to make their own electric energy generation. The discovery of a compact electric gener...

Full description

Saved in:
Bibliographic Details
Main Author: N Nusyirwan
Format: Article
Language:English
Published: Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas 2017-08-01
Series:Metal: Jurnal Sistem Mekanik dan Termal
Online Access:https://metal.ft.unand.ac.id/index.php/metal/article/view/7
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832575006938234880
author N Nusyirwan
author_facet N Nusyirwan
author_sort N Nusyirwan
collection DOAJ
description Electrical energy supply which is not evenly distributed throughout the territory of Indonesia is mainly due to the width of the area the limitation on the budget. This condition has enforcing the rural residents to make their own electric energy generation. The discovery of a compact electric generator with control equipment that is reliable in a variety of sizes and power capacities has increasing the development of small size hydro electric power plants. One of the technology challenges for this power plant is to design a power plant with the existing water resources and equipment available on the market. Base on the preliminaries study in MHP Jorong Patamuan, it is found that the cross-flow turbines with a maximum power of 10 Kw is more appropriate for the electrical generator. The Maximum head for this micro hydro generator is 8 meters and the net loss of 0.4 m. The main channel is composed of a trunk made of concrete channels open with a size of 40 x 40 x 40 cm and a pipeline for rapid pipeline with a length of 28 m using the pipe 8 inches or 20 cm. Generator been Generator one Phase with 10 Kw power. There are constraints in this PLMH operation, which is the state annual river discharge decreased during July and August due to the long dry season so that the water flow is only 0.08 m3 / s, far below the planned discharge 0.2252 m3 / s for the power wat 3000 output only approximately 1/3 of the nominal power 10000 watt than planned.
format Article
id doaj-art-35531c074f8a4c619f3bbc6f45ad5d34
institution Kabale University
issn 2598-1137
2597-4483
language English
publishDate 2017-08-01
publisher Department of Mechanical Engineering, Faculty of Engineering, Universitas Andalas
record_format Article
series Metal: Jurnal Sistem Mekanik dan Termal
spelling doaj-art-35531c074f8a4c619f3bbc6f45ad5d342025-02-01T10:20:39ZengDepartment of Mechanical Engineering, Faculty of Engineering, Universitas AndalasMetal: Jurnal Sistem Mekanik dan Termal2598-11372597-44832017-08-0111404610.25077/metal.1.1.40-46.20176Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik PedesaanN Nusyirwan0Jurusan Teknik Mesin, Fakultas Teknik, Universitas Andalas, PadangElectrical energy supply which is not evenly distributed throughout the territory of Indonesia is mainly due to the width of the area the limitation on the budget. This condition has enforcing the rural residents to make their own electric energy generation. The discovery of a compact electric generator with control equipment that is reliable in a variety of sizes and power capacities has increasing the development of small size hydro electric power plants. One of the technology challenges for this power plant is to design a power plant with the existing water resources and equipment available on the market. Base on the preliminaries study in MHP Jorong Patamuan, it is found that the cross-flow turbines with a maximum power of 10 Kw is more appropriate for the electrical generator. The Maximum head for this micro hydro generator is 8 meters and the net loss of 0.4 m. The main channel is composed of a trunk made of concrete channels open with a size of 40 x 40 x 40 cm and a pipeline for rapid pipeline with a length of 28 m using the pipe 8 inches or 20 cm. Generator been Generator one Phase with 10 Kw power. There are constraints in this PLMH operation, which is the state annual river discharge decreased during July and August due to the long dry season so that the water flow is only 0.08 m3 / s, far below the planned discharge 0.2252 m3 / s for the power wat 3000 output only approximately 1/3 of the nominal power 10000 watt than planned.https://metal.ft.unand.ac.id/index.php/metal/article/view/7
spellingShingle N Nusyirwan
Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
Metal: Jurnal Sistem Mekanik dan Termal
title Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
title_full Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
title_fullStr Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
title_full_unstemmed Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
title_short Kajian Perancangan dan Evaluasi PLTMH Jorong Patamuan Kabupaten Pasaman dalam Mengatasi Kekurangan Listrik Pedesaan
title_sort kajian perancangan dan evaluasi pltmh jorong patamuan kabupaten pasaman dalam mengatasi kekurangan listrik pedesaan
url https://metal.ft.unand.ac.id/index.php/metal/article/view/7
work_keys_str_mv AT nnusyirwan kajianperancangandanevaluasipltmhjorongpatamuankabupatenpasamandalammengatasikekuranganlistrikpedesaan