Scenario-Planning Method for Cost Estimation Using Morphological Analysis

Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning meth...

Full description

Saved in:
Bibliographic Details
Main Authors: Sae-Hyun Ji, Joseph Ahn
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/4962653
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832554556123250688
author Sae-Hyun Ji
Joseph Ahn
author_facet Sae-Hyun Ji
Joseph Ahn
author_sort Sae-Hyun Ji
collection DOAJ
description Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning method that uses morphological analysis for the estimation of construction cost. A case study was conducted using public data on 102 apartment buildings from 10 housing complex projects. The results show estimation accuracy of 4.23 to 4.86% and an average stability enhancement of 1.39 to 1.73%. The proposed process can produce adaptable scenarios and evaluate the impact of the scenarios in a complicated decision-making process with limited information provided. Furthermore, this method can provide a contingency plan to cushion against uncertainties.
format Article
id doaj-art-32f0a2d0769f4ba480eb0577b834df8e
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2019-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-32f0a2d0769f4ba480eb0577b834df8e2025-02-03T05:51:04ZengWileyAdvances in Civil Engineering1687-80861687-80942019-01-01201910.1155/2019/49626534962653Scenario-Planning Method for Cost Estimation Using Morphological AnalysisSae-Hyun Ji0Joseph Ahn1Institute of Construction and Environmental Engineering, Seoul National University, Seoul 08826, Republic of KoreaDivision of Architecture, Civil and Environmental Engineering, Hoseo University, Asan 31499, Republic of KoreaEarly cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning method that uses morphological analysis for the estimation of construction cost. A case study was conducted using public data on 102 apartment buildings from 10 housing complex projects. The results show estimation accuracy of 4.23 to 4.86% and an average stability enhancement of 1.39 to 1.73%. The proposed process can produce adaptable scenarios and evaluate the impact of the scenarios in a complicated decision-making process with limited information provided. Furthermore, this method can provide a contingency plan to cushion against uncertainties.http://dx.doi.org/10.1155/2019/4962653
spellingShingle Sae-Hyun Ji
Joseph Ahn
Scenario-Planning Method for Cost Estimation Using Morphological Analysis
Advances in Civil Engineering
title Scenario-Planning Method for Cost Estimation Using Morphological Analysis
title_full Scenario-Planning Method for Cost Estimation Using Morphological Analysis
title_fullStr Scenario-Planning Method for Cost Estimation Using Morphological Analysis
title_full_unstemmed Scenario-Planning Method for Cost Estimation Using Morphological Analysis
title_short Scenario-Planning Method for Cost Estimation Using Morphological Analysis
title_sort scenario planning method for cost estimation using morphological analysis
url http://dx.doi.org/10.1155/2019/4962653
work_keys_str_mv AT saehyunji scenarioplanningmethodforcostestimationusingmorphologicalanalysis
AT josephahn scenarioplanningmethodforcostestimationusingmorphologicalanalysis